14.06.2013 Views

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ITALY</strong> - 4 Wastewater<br />

1.5 Waste management<br />

1.6 Other activities<br />

- Installations for the disposal or recovery of hazardous waste (operations from D1 to D15,<br />

R 1, R 5, R 6, R 8 and R 9- refer to table below) with a capacity exceeding 10 tonnes per<br />

day<br />

- Installations for the incineration of municipal waste with a capacity exceeding 3 tonnes per<br />

hour<br />

- Installations for the disposal of non-hazardous waste (operations D8 D9- refer to table<br />

below), with a capacity exceeding 50 tonnes per day<br />

- Landfills receiving more than 10 tonnes per day or with a total capacity exceeding 25000<br />

ton, excluding landfills of inert waste<br />

- Industrial plants for the production of:<br />

o pulp from timber or other fibrous materials<br />

o paper and board with a production capacity exceeding 20 tonnes per day<br />

- Plants for the pre-treatment (operations such as washing, bleaching, mercerization) or<br />

dyeing of fibers or textiles where the treatment capacity exceeds 10 tonnes per day<br />

- Plants for the tanning of hides and skins where the treatment capacity exceeds 12 tonnes of<br />

finished products per day<br />

-<br />

o Slaughterhouses with a carcass production capacity > 50 tonnes per day<br />

o Treatment and processing intended for the production of food products<br />

from:<br />

- animal raw materials (other than milk) with a finished product<br />

production capacity > 75 tonnes per day<br />

- vegetable raw materials with a finished product production capacity ><br />

300 tonnes per day (average value on a quarterly basis)<br />

o Treatment and processing of milk, the quantity of milk received being ><br />

200 tonnes per day (average value on an annual basis)<br />

- Installations for the disposal or recycling of animal carcasses and animal waste with a<br />

treatment capacity exceeding 10 tonnes per day<br />

- Installations for the intensive rearing of poultry or pigs with more than:<br />

o 40,000 places for poultry<br />

o 2,000 places for production pigs (over 30 kg), or<br />

o 750 places for sows<br />

- Installations for the surface treatment of substances, objects or products using organic<br />

solvents, in particular for dressing, printing, coating, degreasing, waterproofing, sizing,<br />

painting, cleaning or impregnating, with a consumption capacity of more than 150 kg per<br />

hour or more than 200 tonnes per year<br />

- Installations for the production of carbon (hard-burnt coal) or electrographite by means of<br />

incineration or graphitization<br />

2 Fuel station. Hydrocarbon depot plants.<br />

September 2012 Italy FGS 4-39<br />

Revision 0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!