14.06.2013 Views

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ITALY</strong> - 3 Drinking Water<br />

Table 3.5-a. Minimum Frequency of Sampling (DoD-Produced Water)<br />

Volume of water<br />

distributed or produced<br />

each day within a supply<br />

zone (m 3 )<br />

(1) (2)<br />

Check Monitoring<br />

Number of Samples for<br />

Year<br />

(3)<br />

Audit monitoring<br />

Number of Samples for Year<br />

(3)<br />

1,000 (4) 4 1<br />

1,001 to 10,000<br />

4 + 3 for each 1,000 m 3 /d<br />

and part thereof of the total<br />

volume<br />

1 + 1 for each 3,300 m 3 10,001 to 100,000<br />

/d and part<br />

thereof of the total volume<br />

3 + 1 for each 10,000 m 3 >100,000<br />

/d and part<br />

thereof of the total volume<br />

10 + 1 for each 25,000 m 3 /d and part<br />

thereof of the total volume<br />

Notes:<br />

1. A supply zone is a geographically defined area within which water intended for human consumption comes<br />

from one or more sources and within which water quality may be considered as being approximately<br />

uniform.<br />

2. The volumes are calculated as averages over a calendar year. In order to determine the minimum<br />

frequency, the number of inhabitants in a supply zone may be used instead of water volume, assuming a<br />

water consumption of 200 l/day/capita.<br />

3. To the extent possible, the number of samples should be distributed equally in time and location.<br />

4. If the volume is < 100 m 3 , monitoring frequency requirements are at the discretion of the local Health<br />

Board (ASL), or the DoD medical authority, whichever is more stringent.<br />

Example Calculation:<br />

For 75,250 m 3 /d of distributed water, the following samples should be collected in one year:<br />

Check monitoring: 4 + 3 x (75,000 / 1,000 + 1) = 232<br />

Audit monitoring: 3 + 1 x (70,000 / 10,000 + 1) = 11<br />

September 2012 Italy FGS 3-23<br />

Revision 0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!