14.06.2013 Views

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

ENVIRONMENTAL FINAL GOVERNING STANDARDS ITALY

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ITALY</strong> - APPENDIX C Determination of Worst Case Discharge Planning Volume<br />

equals the capacity of the largest single above ground oil or hazardous substance storage<br />

container.<br />

APC1.4.2.3. Facilities having partial secondary containment. If some, but not all above<br />

ground storage containers at the facility have adequate secondary containment, the WCD<br />

planning volume equals the sum of:<br />

APC1.4.2.3.1. The total capacity of the above ground oil and hazardous substance<br />

storage container that lacks adequate secondary containment; plus<br />

APC1.4.2.3.2. The capacity of the largest single above ground oil or hazardous<br />

substance storage container that has adequate secondary containment.<br />

APC1.4.3. For purposes of this Appendix, the term “adequate secondary containment” means<br />

an impervious containment system such as a dike, berm, containment curb, drainage system or<br />

other device that will prevent the escape of spilled material into the surrounding soil.<br />

September 2012 Italy FGS APPENDIX C.1-2<br />

Revision 0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!