effectively shielded and does not require a lightning protection system. Lightning protection for<br />

the Buildings 996,997, 998 and 999 is not required since these structures are underground.<br />

2.3.7 Building Drain System<br />

Drains are located on the ro<strong>of</strong> <strong>of</strong> Building 991 to drain water from the ro<strong>of</strong>. The drains<br />

flow directly into the sanitary waste system.<br />

Sanitary drains are located throughout Building 991 and drain directly into the sanitary<br />

waste system as discussed in Section 2.3.5.3.<br />

2.3.7.1 Filter Plenum Drain Systems<br />

The Building 985 plenum is supplied with a fire water holding tank to catch water from<br />

operation <strong>of</strong> the plenum deluge system. The fire water holding tank is located in a pit at the east<br />

end <strong>of</strong> Building 985. The tank is designed to collect the drains from the exhaust plenum in the<br />

event the plenum fire sprinklers are activated. If water is introduced into this tank, Waste<br />

Management is contacted for assistance in the disposal <strong>of</strong> the water. The system has a<br />

recirculating system for sampling the water and a pump that discharges to a hose connection by<br />

the east door <strong>of</strong> the building. By utilizing the pump and hose connection the contents could be<br />

transferred to a mobile tank by hose and transported to a disposal site. The fire water holding<br />

tank does not contain Raschig rings. In addition to the plenum drains, a sump pump in the fire<br />

water holding tank also discharges to the tank.<br />

The Building 991 ro<strong>of</strong> plenum has no fire water holding tank. Water from the plenum<br />

deluge system drains from a drain located in the plenum directly into the sanitary waste system.<br />

2.3.8 Confinement Systems<br />

The primary means <strong>of</strong> codhement in the Building991 Complex are the shipping<br />

packages. The secondary me& <strong>of</strong> confinement is provided by the concrete construction <strong>of</strong> the<br />

Building991 Complex. Since operations with unconfined materials are not allowed in the<br />

Building 991 Complex (Le., waste containers are not opened in the complex), other confinement<br />

systems are not required.<br />

Currently, material being moved or stored in the Building 991 Complex is in approved<br />

on-site or <strong>of</strong>f-site shipping packages. TRU waste, received from the PA is packaged in<br />

55 gallon drums, DOT-7A Type A Metal Waste Boxes, or Transuranic Package Transporter 11<br />

(TRUPACT II) Standard Waste Boxes (SWs).<br />

One type <strong>of</strong> 55-gallon dnun received and stored by the facility is the pipe overpack<br />

container (POC). The POC was designed to optimize shipments <strong>of</strong> high plutonium content TRU<br />

waste from Rocky Flats Environmental Technology Site WETS) to the Waste Isolation Pilot<br />

Plant (WIPP). The container was approved for use in the TRUPACT I1 shipping container by<br />

the Nuclear Regulatory Commission in February 1997. The POC consists <strong>of</strong> a seded pipe<br />

Revision 1<br />

Wlildmg 991 Complex FSAR<br />

Sepbnher 1999 I