TERM DEFINITION<br />

DESIGN FEATURES Those passive features which, if altered or modified, could have a<br />

significant effect on safety.<br />

DISCOVERY/<br />

The point in time when it is realized that a CONDITION has been<br />

DISCOVERED entered.<br />

EMERGENCY<br />

EVACUATION<br />

Any evacuation as a result <strong>of</strong> a significant deviation from planned<br />

or expected behavior or course <strong>of</strong> events that could result in<br />

significant consequences to people, property, the environment, or<br />

security. It includes unusual events, alerts, Site emergencies, and<br />

general emergencies.<br />

LIMITING CONDITION The lowest functional capability or performance level <strong>of</strong> SAFETY<br />

FOR OPERATION &CO) SSCs and their support systems required for safe operations <strong>of</strong> the<br />

facility.<br />

NUCLEAR MATERIAL, Includes Special Nuclear Material (enriched uranium,<br />

uranium-233, uranium-235, or plutonium), americium, or<br />

neptunium in quantities <strong>of</strong> one gram or more. It does not include<br />

natural uranium, depleted uranium, contamination, or sealed<br />

sources.<br />

OPERABLE/<br />

OPERABILITY<br />

OUT OF COMMISSION<br />

A SAFETY SSC shall be OPERABLE when it is capable <strong>of</strong><br />

performing its safety function(s) as specified in Chapter 5 <strong>of</strong> the<br />

FSAR for compliance with the TSRs.<br />

Identifies equipment that has been rendered not available or<br />

credited for operation. OUT OF COMMISSION equipment is<br />

considered to be administratively removed from the facility and<br />

no longer subject to the requirements specified in the TSRs.<br />

OUT OF COMMISSION implies that actual physical<br />

modification, isolation, or removal can be performed without<br />

affecting the overall safety <strong>of</strong> the facility. For the purpose <strong>of</strong> the<br />

TSRs, equipment, systems, andor areas are OUT OF<br />

COMM[SSION when all <strong>of</strong> the following conditions have been<br />

satisfied:<br />

a. The isolation boundary and the affected equipment is<br />

properly tagged or labeled and controlled in a manner that<br />

will prevent use.<br />

b. An evaluation <strong>of</strong> the administrative removal <strong>of</strong> the affected<br />

equipment from service on facility safety has been<br />

performed.<br />

c. Analysis shows that any radioactive or other hazardous<br />

material remaining in the OUT OF COMMISSION<br />

equipment is safely contained.<br />

A-7 Building 991 Complex FSAR<br />

Appendix A