17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPLICABILITY: Adequate staffing for the BUILDING 991 COMPLEX is<br />

applicable at all times as stated above.<br />

ACTIONS:<br />

1 CONDITION<br />

8<br />

1. The minimum designated<br />

staang is not maintained.<br />

1. Restore staffing to minimum requirements.<br />

- OR<br />

2.1 Make appropriate notifications within the<br />

facility and the Site Shift Superintendent.<br />

AND<br />

2.2 Terminate affected operations.<br />

I<br />

2. XotScation that the Fire 1. Tenninate all hot work in the BUZLDISG 991<br />

Dameat does not have COMPLEX.<br />

milimm StaffinE muired to a<br />

~<br />

reswnd to B fire in the<br />

BUILDING 991 CO-WLEX<br />

Revision 1<br />

September 1999<br />

1 REQUIRED ACTION<br />

I<br />

COMPLETION<br />

TIME<br />

4 hours<br />

4 hours<br />

4 hours<br />

4 horn<br />

2. SUSPEND OPERATIONS in all .AFFECTED<br />

AREAS.<br />

4 hours<br />

A-8 1 Building 99 1 Complex FSAR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!