ACTIONS:<br />

CONDITION<br />

1. Failure <strong>of</strong> an SC-3 SSC in<br />

the BUILDING 991<br />

COMPLEX.<br />

2. REOUfRED ACTION and<br />

COMPLETIO% TIME can<br />

not be met in REQUIRED<br />

ACTIOX 2 <strong>of</strong><br />

CONDITION 1<br />

REQUDRED ACTION<br />

1. Perform any compensatory<br />

measures defined in Site<br />

procedures dealing with the<br />

AND<br />

2.<br />

ssc.<br />

Repair and restore the failed<br />

sc-3 ssc.<br />

1. Submit an action pian and<br />

schedule for SC-3 SSC<br />

restoration to the DOE-RFFO if<br />

the svstem is ewectcd to remain<br />

failed for UD to and including<br />

120 davs.<br />

OR<br />

~<br />

2. Submit a JCO for havim the<br />

failed svstern to the DOE-RFFO<br />

if the wstem is expected to<br />

reruaitl or renuins failed for<br />

more than 120 dam<br />

COMPLETION TIME<br />

As specified in Site procedures.<br />

45 days.<br />

45 days from the the <strong>of</strong> enw into<br />

CONDITION ‘1.<br />

45 days fiorrn the time <strong>of</strong> enm into<br />

COIWITION 1 if CONDITION 2,<br />

REOUlRED ACTIOX 1 is not<br />

perfo nned;<br />

120 dam from che time <strong>of</strong> entry<br />

ACTIOX I is Derfonned.<br />

NOTE: The action plan developed in CONDITION2. REOUIRED ACTION 1 shall<br />

(1) characterize the deficiencv, (2) state the effect <strong>of</strong> the deficiency on the FSARreauired<br />

safew fhiction. (3) address the collective significance <strong>of</strong> the deficiency with<br />

otlier existing facility conditions (e..c.. current JCOs. discovew issues. other equipment<br />

with dearaded safety functions). (4’) define actions that have been taken to ensure and<br />

maintain a safe facilitv confrmation, (5) provide the repair stratem and schedule in<br />

sufficient detail to establish critical path milestones (ex.? recebt <strong>of</strong> replacement parts.<br />

vendor availabilitv’). Action rrlans will onlv be used for routine maintenance.<br />

Revision 1.<br />

Sen?cmkr 1999<br />

A-101 Building 99 1 Complex FSAR<br />