The immediate worker analysis is insensitive to analysis assumptions or credited controls<br />

due to the impact <strong>of</strong> the earthquake on the facility and the corresponding mockrate radiological<br />

consequences to the immediate worker as a result <strong>of</strong> the falling debris incatmitatin? the nl:<br />

The level <strong>of</strong> earthquake that is postulated would have similar effects on workers in most other<br />

buildings, on or <strong>of</strong>f the Site.<br />

The risk from accident scenarios that were not risk dominant scenarios (i.e.. low nsk<br />

scenarios: Risk Class TI1 or IV for all recemors) can be lowered. in manv cases. as a result <strong>of</strong> the<br />

crediting <strong>of</strong> a single - tested stage <strong>of</strong> HEPA filtration for mitigation <strong>of</strong> risk dominant accident<br />

scenarios. Some other risk reduction measures that may not be necessaw from a nuclear safeti<br />

permective, should be included. where wssibie. EX~DICS include: (1) use <strong>of</strong> flammable gas<br />

cylinders with caDacities or loaded to levels that are limited to a level necessq for the<br />

maintenance advitv being performed and (2) preferential storage <strong>of</strong> POC containers rather than<br />

Revision<br />

Swtmnber 1'999<br />

4-40 Building991 Complcx FSAR