Table 5-1 provides the matrix reIating safety features identified in the hazard and<br />

accident analyses to safety SSCs. arid provides the svstern cate3orv (SC-1/2. SC-3. and SC-4)<br />

designation <strong>of</strong> &e safety SSCs. Section 5.2.1, S'C-11'3 SSC's. and Section 5.3.2. SC-3 SSC.s, then<br />

identify the safetv functions. system boundaries, support svsterns, and functional requirements<br />

for the armlicable safety SSC.<br />

Revision 1<br />

September 1999<br />

5-4 Building 991 Complex FSAR