3./4. LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE<br />

REOUIREMENTS<br />

4.1 SURVEILLANCE REQUIREMENTS: BUILDING 991 COMPLEX AUTOMATIC<br />

SPRINKLER SYSTEMS AND FLOWISRZOKE DETECTION ALARMS<br />

SR 4.1.1 Verify correct positioning <strong>of</strong> post indicating valves<br />

(PIVs) and sprinkler control valves.<br />

SR 4.1.2 Verify that the static pressures in Riser Systems A and B<br />

are greater than 27 psi.<br />

SR 4.1.3 Verify that the air pressure in dry pipe Automatic<br />

Sprinkler System B is between 25 psig and 45 psig and<br />

verify that the air pressure in the dry pipe portion <strong>of</strong><br />

Automatic Sprinkler System A is between 35 psig and<br />

50 psig.<br />

~~<br />

~~ ~<br />

SR 4.1.4 Perform a main drain flow test at Riser Systems A and<br />

B.<br />

SR 4.1.5 Perform a water flow alarm test at an inspector's test<br />

connection and veri@ Riser System A and B alarm<br />

transmittal to Fire <strong>Department</strong>.<br />

SR 4.1.6 Perfbrm visual inspection <strong>of</strong> Automatic Sprinkler<br />

Systems A and B.<br />

SR 4.1.7 Perform operational test <strong>of</strong> dry pipe Automatic<br />

Sprinkler System B and the dry pipe portion <strong>of</strong><br />

Automatic Sprinkler System A.<br />

~~~<br />

~~~ ~<br />

SR 1.1.8 Perform visua1 inspection <strong>of</strong> Smoke Detection Fire<br />

Alarm Pmel and the facilitv Smoke Detectors.<br />

Once per month.<br />

Once per month.<br />

Once per month.<br />

Once per quarter.<br />

Once per quarter.<br />

Once per year.<br />

Once per year.<br />

Once per 6 months.<br />

SR 4. I .9 Perform operational test <strong>of</strong> the Smoke Detection System Once per year.<br />

and verifv alarm transmittal to Fire <strong>Department</strong>.<br />

Revision 1<br />

Sontcrn her I. 999<br />

A-26 Building 991 Complex FSAR<br />

Appendix A