LSDW speakers are located throughout the Building 991 Complex. A building<br />

amplification system drives the individual speaker-dedicated amplifiers. The LS/DW panel is<br />

located in Room 129. There are location2 within Building 991 where the LSDW system cannot I<br />

be heard. These areas are posted.<br />

2.3.4 Compressed Air System<br />

Compressed air is required for the dry-pipe suppression systems located in the<br />

Building 991 Complex. These areas are the East Dock, Building 989, the West Dock<br />

(Room 170), and the west canopy area. Compressed air is supplied to these systems by either a<br />

compressor in Building 991 (Room 130) or the compressor located in Building 985. Either<br />

compressor has the capacity to supply'the load required by the dry-pipe suppression systems.<br />

The compressor located in Room 130 is normally operated in the manual position and the<br />

control on the air receiver will load the compressor at 80 psi and unload at it at 90 psi. Cooling<br />

water to the after cooler and the compressor is from the DCW system through a backflow<br />

preventer located on the south wall <strong>of</strong> Room 130 under the after cooler. This water flow is<br />

adjusted to not use excessive water but supply enough cooling. This cooling water flow must be<br />

checked on each tour <strong>of</strong> the building.<br />

The second compressor, located in Building 985, will start if air pressure falls to 65 psi<br />

and will supply both dry-pipe suppression systems. This unit wil cycle <strong>of</strong>f at 80 psi.<br />

Buildirig985's air compressor capacity is large enough to supply the dry-pipe suppression<br />

systems for short periods <strong>of</strong> time, but should not be operated for extended periods without<br />

cutting back on air usage. On loss <strong>of</strong> normal power, the Building 985 compressor is supplied<br />

power from the Building 989 diesel generator.<br />

The air system is in operation continuously and the operating compressor is checked<br />

daily for proper operation.<br />

2.3.5 Utility Systems<br />

2.3.5.1 Electrical Services<br />

Electrical power is supplied to the Site by Public Service Company (PSC) <strong>of</strong> Colorado<br />

Three main feeds from the PSC transmission grid supply electrical power at 11 5 kilovolt (kV)<br />

Parallel transmission lines from Ralston and Eldorado enter the Site from the east, north <strong>of</strong> the<br />

Industrial Area. A thrrd feed, &om the United Power Plainview, enters the Site from the west,<br />

south <strong>of</strong> the Industrial Area. Each <strong>of</strong> the feeds can be switched to supply the entire Site by<br />

themselves. The Ralston and Eldorado feeds have automatic switching capability while the<br />

Plainview feed has to be manually switched. The electrical power system on site consists <strong>of</strong><br />

substations and secondary substations; the main switchgear; the ring bus switchyard; the<br />

overhead and underground electrical distribution lines, buses, support components, and outdoor<br />

lighting; and staff <strong>of</strong>fices and maintenance facilities. All 115 kilovolt (kv) distribution is the<br />