5B.0 GENERAL APPLICATION BASES<br />

Revision 1<br />

Saptcmher 1999<br />

ACs 5.0.1 through 5.0.5 establish the rules for AC use and application and are applicable<br />

to all ACs at all times, unless otherwise stated. Since ACs are primarily for<br />

DEFENSE-IN-DEPTH and worker safety, the requirements are not as rigorous and the<br />

safety impact <strong>of</strong> individual failures is not as severe as for engineered system LCOs and<br />

SRs. These AC rules are fully consistent with the Applicability LCOs and general SRs<br />

and their BASES, which are provided to control LCOs and SRs for the engineered<br />

s ys terns.<br />

AC 5.0.1 establishes the requirement that ACs are to be met at all times. Each AC is<br />

divided into two distinct requirement sections. All ACs will have CREDITED<br />

PROGRAMMATIC ELEMENTS. Certain ACs will contain specific controls or<br />

restrictions consisting <strong>of</strong> limits and controls that have associated action statements. The<br />

manner in which the ACs are met is defined by either specific controls or restrictions<br />

with an associated action statement or by adherence to CREDITED PROGRAMMATIC<br />

ELEMENTS.<br />

ACs 5.0.2 through 5.0.4 establishes the rules under which failures in AC programs<br />

progress fiom the level <strong>of</strong> individual failures <strong>of</strong> CREDITED PROGRAMMATIC<br />

.ELEMENTS or failure <strong>of</strong> specific controls or restrictions through to VIOLATION <strong>of</strong> the<br />

AC.<br />

CREDITED PROGRAMMATIC ELEMENTS is a defined term relating to<br />

programmatic elements that are credited for controlling the progression <strong>of</strong> an accident<br />

scenario. These elements minimize the potential frequency or consequence <strong>of</strong> an<br />

accident scenario. They are reflected in assumed operational aspects that impact base<br />

frequency or available hazardous material assumptions. Controls or restrictions relate to<br />

aspects <strong>of</strong> operation that limits the frequency or consequence <strong>of</strong> an accident scenario<br />

These latter conform to the limits <strong>of</strong> the analysis (e.g., total material-at-risk in a facility<br />

available for involvement in a seismic event or maximum amounts <strong>of</strong> material-at-risk<br />

allowed in certain containers or locations).<br />

A- 108 Building 991 Complex FSAR<br />

Appendix h