17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I<br />

1.2 LOGICAL CONNECTORS (continued)<br />

ACTIONS:<br />

CONDITION<br />

1. The CONDITION<br />

REQUIRED ACTION<br />

For statements containing<br />

three levels:<br />

For the 1" level - The<br />

connector is le3 justified to the<br />

column and the criteria are<br />

single numbered.<br />

For the 2nd level - The<br />

connector is indented once to<br />

the right and the criteria are<br />

double numbered.<br />

For the 3d level - The<br />

connector is indented twice to<br />

the right and the criteria are<br />

triple numbered.<br />

1 The REQUIRED ACTION<br />

OR<br />

2.1 TheREQUIRED<br />

ACTION<br />

AND<br />

2.2.1 The REQUIRED<br />

ACTION<br />

OR<br />

2.2.2 ThzQuIRED<br />

ACTION<br />

COMPLETION TIME<br />

This example demonstrates I .t for CONDITION 1, either REQUIRED ACTION 1, or<br />

REQUIRED ACTION 2.1 must be completed. If 2.1 is chosen, an additional requirement,<br />

indicated by the indented logical connector AND, is imposed. This additional requirement is<br />

met by choosing 2.2.1 or 2.2.2. The indented position <strong>of</strong> the logical connector OR indicates that<br />

2.2.1 and 2.2.2 are alternate and equal choices, one <strong>of</strong> which shall be performed.<br />

Revision<br />

Scptcrnher 1999<br />

A-1s Building 991 Complex FSAR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!