17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3./4. LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE<br />

REQUIREMENTS<br />

3.1 LIMITING CONDITION FOR OPERATION: BUILDING 991 COMPLEX<br />

AUTOMATIC SPRINKLER SYSTEMS AND FLOW/SICIOKE DETECTION<br />

ALARMS<br />

LCO: The BUILDING991 COMPLEX Automatic Sprinkler System and<br />

Flow/Smoke Detection Alarm Transmittal Systems Shall Be OPERABLE.<br />

APPLICABILITY:<br />

REQUIRED ACTIONS:<br />

~ ~~<br />

CONDITION<br />

A. Automatic Sprinkler<br />

System not OPERABLE<br />

in Building 991 Office<br />

Areas.<br />

B. Automatic Sprinkler<br />

System not OPERABLE<br />

in areas other than the<br />

Building 991 Office Area.<br />

C. Loss <strong>of</strong> Automatic<br />

Sprinkler System Flow<br />

Alarm transmittal<br />

capability to the Fire<br />

<strong>Department</strong> for Riser<br />

System A.<br />

Revision 1.<br />

September 1993<br />

At all times in the Building 991 Waste Container Storage Areas, in the<br />

Building991 Office Areas, in BuiIding998 (Room300 and<br />

Corridor A), in the Building 991 West Dock Canopy Area, in the<br />

Building 991 East Dock Canopy Area. and in Building 996 {Corridor B<br />

and Building 996).<br />

A. 1 Establish a fire watch in<br />

accordance with Site<br />

requirements in Building 991<br />

AND<br />

A.2<br />

B. 1<br />

Office Areas.<br />

Terminate all hot work in the<br />

Office Areas.<br />

Establish a fire watch in<br />

accordance with Site<br />

requirements in AFFECTED<br />

AREAS.<br />

AND<br />

B.2 SUSPEND OPERATIONS in<br />

AFFECTED AREAS.<br />

C. 1 Establish a fue watch in<br />

accordance with Site<br />

requirements in AFFECTED<br />

AND<br />

C.2<br />

AREAS.<br />

Terminate all hot work in the<br />

Office Areas.<br />

- AND<br />

C.3 SUSPEND OPERATIONS in<br />

all other AFFECTED AREAS.<br />

A-24<br />

COMPLETION T E<br />

4 hours.<br />

2 hours.<br />

4 hours.<br />

4 hours.<br />

2 hours.<br />

4 hours.<br />

Building 991 Complex FS.U<br />

Appendtx A<br />

i<br />

I<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!