AOL 10 A flammable gas use control program shall be implemented in the<br />

BUILDING 991 COMPLEX. Attributes for the flammable gas program<br />

include:<br />

Restrictions on flammable gas containers including:<br />

Flammable gas containers shall meet DOT requirements; and<br />

Flammable gas container (fully charged) contents shall not exceed a maximum gas volume <strong>of</strong><br />

150 cubic feet.<br />

Restrictions on flammable gas container location and use including:<br />

Flammable gas containm shall not be placed within five feet <strong>of</strong> radioactive material containers;<br />

Flammable gas containers shall not be taken into waste container storage area Room 135,<br />

Room 142, Room 143, Room 147, Room 148, Room 158, and Building 996; and<br />

Flammable gas shall not be used in vaults while SNM is present.<br />

The flammable gas use control promam in the BUILDKG 991 COh4PLEX shall be<br />

verified to be corndiant with this requirement once per month.<br />

APPLICABILITY: At all times in the BUILDING 991 COMPLEX.<br />

ACTIONS:<br />

CONDITION<br />

1. Flammable gas container<br />

requirements not met while<br />

waste containers in storage in<br />

the BUILDING 991<br />

COMPLEX<br />

Revision<br />

September 1993<br />

REQUIRED ACTION<br />

1. If flammable gas container is<br />

non-compliant with DOT requirements,<br />

remove non-compliant flammable gas<br />

container from applicable areas (see<br />

- OR<br />

2.<br />

BASES).<br />

If flammable gas container exceeds<br />

volume limits, remove non-compliant ,<br />

flammable gas container from applicable<br />

areas (see BASES).<br />

COMPLETION<br />

TIME<br />

1 hour.<br />

1 hour.<br />

A-98 Building 99 1 Complex FSAR<br />

Appendix A