BASIS: The minimum staffing requirements ensure that sufficient resources are available to<br />

fulfill credited safety operations. Four hours is considered suficient t he for the<br />

facility to restore minimum staffing requirements or make appropriate notifications<br />

within the facility and to the Site Shift Superintendent. Four hours is also considered<br />

sufficient time to terminate affected operations and place the facility in a safe<br />

configuration.<br />

Revision 1<br />

September 1999<br />

The Site Fire and Emergency Services <strong>Department</strong> is essential for nuclear and life<br />

safety at the Site. The BUILDING 991 COMPLEX relies on the Fire <strong>Department</strong> to<br />

minimize material at risk involvenient in the event <strong>of</strong> an accident involving a fire.<br />

The safety analysis in NSTR-011-98 does riot specifically credit the Site Fire<br />

Demrtment since the size <strong>of</strong> the fires analvzed inside Building 991 (Le.. 1 klW and<br />

3 MW fires) would be expected to self-extinguish Dfior to resDonse from the Fire<br />

Demrtment. For the fires analvzed to occur under the West Dock Canopy. it was<br />

assumed that Dersonnel would not notice the frre and reDort it to the Fire <strong>Department</strong><br />

in a timelv manner. Since a DrornDt Fire Deuartment response could mitigate the<br />

effects <strong>of</strong> a fire in the BLXDING 991 COMPLEX. the Fire DeDment was credited<br />

as discussed in Chapter 5 <strong>of</strong> the F%R Four hours is considered sufficient time for<br />

the facility to terminate all hot work in the facilitv and to terminate affected<br />

ODerations and place the facilitv in a safe confieuration.<br />

A-1 11 Buildmg 991 Complex FSAR<br />

Appendix A