5B.5 EMERGENCY RESPONSE BASES<br />

5B.5.1 Requirement for Emergency Response BASES<br />

The Building Emergency Response Operations procedure is credited in the accident<br />

analysis to mitigate potential consequences from a spill or release <strong>of</strong> NUCLEAR<br />

MATERIAL.<br />

5B.5.2 CREDITED PROGRAMMATIC ELEMENTS BASES<br />

The approved Building Emergency Response Operations procedure ensures the facility IS<br />

capable <strong>of</strong> responding to a spill or release. The procedure provides for the following:<br />

Revision 1<br />

September 1999<br />

a. Periodic evacuations drills, including identification <strong>of</strong> egress routes, assembly<br />

areas, and personnel accountability;<br />

b. Emergency notification (e.g., LSDW, two-way radios); and<br />

c. Spill response, including the availability and maintenance <strong>of</strong> emergency<br />

equipment and material.<br />

Specific Emergency Plans will be modified, as necessary, to reflect new and modified<br />

activities ensuring adequate plan coverage.<br />

A-130 Building 991 Complex FS \K<br />