17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.4<br />

5.4.1<br />

5.4.2<br />

5.4.3<br />

Revision 1<br />

Scnternher 1.990<br />

MAINTENANCE AND SURVEILLANCE OF SC-3 SSCS<br />

Requirements for Maintenance and Surveiliance <strong>of</strong> SC-3 SSCs<br />

A program shall be developed, implemented and maintained to provide the required<br />

safety functions <strong>of</strong> SC-3 SSCs.<br />

APPLICABILITY: This control applies to the SSCs in Table 2 which are the SC-3 SSCs<br />

identified in the safety analyses for DEFENSE-IN-DEPTH and worker safety, and the<br />

SC-3 SSCs required to support SC-1/2 SSCs.<br />

CREDITED PROGRAMMATIC ELEMENTS<br />

The program shall include the following CREDITED PROGRAMMATIC ELEMENTS<br />

a. Safety functions provided by SC-3 SSCs are maintained as stated in Table 2;<br />

b. The functionality <strong>of</strong> in-service SC-3 SSCs is periodically verified;<br />

c. SC-3 SSCs are inspected and/or acceptance tested following repair;<br />

d. Changes made to SC-3 SSCs, and associated engineering documentation and<br />

operating instructions, are controlled; and<br />

. e. Applicable corrective actions resulting from periodic inspection findings<br />

(e.g., Fire Protection) are implemented commensurate with their safetv<br />

significance.<br />

Specific Controls or Restrictions<br />

The following action statements are implemented when the associated SC-3 SSC safety<br />

hctions are not provided.<br />

NOTE: Surveillance frequency is as specified in Section 1.7 and each surveillance shall<br />

be performed within 1.25 <strong>of</strong> the specified frequency. Use <strong>of</strong> the 25% grace period does<br />

not extend the due date for the next surveillance period.<br />

APPLICABILITY: To SC-3 SSCs at all times in the BUILDING 991 COMPLEX<br />

A- 100 Building 991 Complex FSM 1<br />

Appendix A !

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!