5.9 CONFIGURATION MANAGEMENT<br />

5.9.1 Requirements for M'0t-k Control<br />

The Confiswration Management DrogTam ensures that SC-1/2 and SC-3 SSCs (including<br />

Design Features) are subiect to configuration change control.<br />

5.9.2 CREDITED PROGRA3IIVUTIC ELEMEKTS<br />

Safetv and technical review and validation <strong>of</strong> desin modification work on or potentiah<br />

impacting SC-t!? and SC-3 SSCs shall be performed before approval and<br />

implementation <strong>of</strong> the design.<br />

A-I07<br />

Building 991 Complex FSAR<br />

Appendix A<br />