17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AOL 2 SNM containers staged in the BUILDING 991 COMPLEX shall meet Type B<br />

shipping container certification. SNM containers shall only be staged in vaults<br />

in the BUILDING 991 COMPLEX.<br />

1 CONDITION<br />

L<br />

All SNM containers received at the BUILDING991 COMPLEX docks shall be<br />

verified to be compliant with this requirement either before shipment to the<br />

BUILDING 99 1 COMPLEX or at receipt.<br />

1. SNM container does not meet<br />

Type B shipping container<br />

certification requirements when<br />

received.<br />

2. Discovery that SNM container<br />

is not stored inside a vault in<br />

the BUILDING 991<br />

COMPLEX.<br />

Revision 1<br />

Sentcmbar I999<br />

APPLICABILITY: At all times in the Building 991 west dock and the vault areas <strong>of</strong><br />

the BUILDING 991 COMPLEX.<br />

ACTIONS:<br />

REQUlRED ACTION<br />

1. Remove the non-compliant SNM<br />

container from the BUILDING 991<br />

COMPLEX.<br />

1. Notify facility management <strong>of</strong> a SNM<br />

containexfs) outside a vault.<br />

- AND<br />

2.<br />

Move the non-compliant staged SNM<br />

container into a vault or remove from the<br />

BUILDING 991 COMPLEX<br />

TIME I .<br />

Y<br />

1 hour.<br />

A-84 Building 991 Complex FSAR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!