limits on container radioactive material, and restriction <strong>of</strong> selected items (e.g., combustibles,<br />

flammable gases).<br />

1.6 DESIGN FEATURES<br />

DESIGN FEATURES are the facility passive protective features that reduce the<br />

frequency and/or mitigate the consequences <strong>of</strong> uncontrolled releases <strong>of</strong> radioactive or other<br />

hazardous materials from the facility for postulated accident scenarios analyzed in the FSAR.<br />

These DESIGN FEATURE descriptions are provided in the TSRs to assure that evaluations <strong>of</strong><br />

proposed changes or modifications to these DESIGN FEATURES are properIy performed and<br />

documented, consistent with requirements specified in the TSRs.<br />

1.7 FREQUENCY NOTATION<br />

The frequency notations, as used in surveillances and elsewhere, are defined as follows<br />

when included in the TSR:<br />

Notation<br />

Once per Working Shift<br />

Once per Day<br />

Once per Week<br />

Once per Month<br />

Once per Quarter<br />

Once per 6 Months<br />

Once per Year<br />

Once per 18 Months<br />

Once Der 3 Years<br />

Minimum Freauencv (Periodicitv Notation)<br />

At least once per Working Shift.<br />

At least once per 24 hours.<br />

At ieast once Der 7 days.<br />

At least once per 3 1 days.<br />

At least once per 92 days.<br />

At least once Der 6 months.<br />

At least once per 12 months.<br />

At least once Der 18 months.<br />

At least once oer 36 months<br />

1.8 TECHMCAL SAFETY REQUIREMENTS BASES CONTROL<br />

The contractor may make changes to the TSR BASES without prior <strong>Department</strong> <strong>of</strong><br />

Energy-Rocky Flats Field Office (DOE-RFFO) approval provided the changes do not involve<br />

any <strong>of</strong> the following:<br />

1. A change in the controls specified in the TSRs; or<br />

2. A change to the FSAR that involves a positive USQ.<br />

Proposed changes that meet the criteria <strong>of</strong> (1) or (2) above shall be reviewed and<br />

approved by the DOE-RFFO prior to implementation. Changes to the BASES that may be<br />

Revision L.<br />

September 1999<br />

A-12 Building 991 Complex FSAR<br />

Appendix A