- Page 2 and 3:
,._I REVIEW AND APPROVAL FOR BUILDI
- Page 4 and 5:
i L- FACILITY OVERWEW The Building
- Page 6 and 7:
Based on the information in Table 1
- Page 8 and 9:
i ,: - DF 1 - DF 3 - DF 3 DFJ - DF
- Page 10 and 11:
AB AC ACI ALARA Am AOL ARCIE ASME B
- Page 12 and 13:
j ?,.- LCO L.L.C. LLW LSDW MAL MAR
- Page 14 and 15:
V Volt WAD Work Authorization Docum
- Page 16 and 17:
. 2.3.1 Fire Suppression. Detection
- Page 18 and 19:
Figure 2-2 Building 991 and Associa
- Page 20 and 21:
THIS PAGE INTENTIONALLY LEFT BLANK
- Page 22 and 23:
THIS PAGE INTENTIONALLY LEFT BLANK
- Page 24 and 25:
Chapter 6 Derivation of Technical S
- Page 26 and 27:
Table 1-1 DOE-STD-3009 and Building
- Page 28 and 29:
identified along with the change in
- Page 30 and 31:
area), and other types of hazardous
- Page 32 and 33:
Conduct of receipt, staging and shi
- Page 34 and 35:
contamen received Accuracy Report &
- Page 36 and 37:
1.2.6.2 Safety Analysis Summary Pot
- Page 38 and 39:
polishing equipment. The Metallogra
- Page 40 and 41:
under this set of documents include
- Page 42 and 43:
specified in HSP 11.03 were met by
- Page 44 and 45:
USQD-991-98.0900-MIU (Ref. 20) was
- Page 46 and 47:
17 18 19 20 21 22 23 24 25 26 27 28
- Page 48 and 49:
a THIS PAGE INTENTIONALLY LEFT BLAN
- Page 50 and 51:
During the 1980s, Final Quality Cer
- Page 52 and 53:
Revision L September 1990 Figure 2-
- Page 54 and 55:
Building 989 - Diesel Generator Bui
- Page 56 and 57:
THIS PAGE HAS BEEN LEFT BLANK DUE-T
- Page 58 and 59:
Bearing walls and intermediate conc
- Page 60 and 61:
concrete structure with exterior di
- Page 62 and 63:
1 ,j I Minor cracks and leaking hav
- Page 64 and 65:
uilding. Differential displacement
- Page 66 and 67:
in wooden waste containers and stor
- Page 68 and 69:
THIS PAGE HAS BEEN LEFT BLANK DUE-T
- Page 70 and 71:
THIS PAGE HAS BEEN LEFT BLANK DUE-T
- Page 72 and 73:
Table 2-1 Fire Suppression Systems
- Page 74 and 75:
The sprinkler system consists of a
- Page 76 and 77:
connect hoses to a hydrant and flow
- Page 78 and 79:
Revision I Scptcmber 1999 Figure 2-
- Page 80 and 81:
filters against the impacts of larg
- Page 82 and 83:
2.3.2 Heating, Ventilation, and Air
- Page 84 and 85:
The S-1 system has outside air damp
- Page 86 and 87:
Supplv Zone 4 (S-4) The S-4 supply
- Page 88 and 89:
Table 2-2 Building 991 Complex Exha
- Page 90 and 91:
THIS PAGE HAS BEEN LEFT BLANK DUE-T
- Page 92 and 93:
system contains an untested HEPA st
- Page 94 and 95:
The burners are Model LNR 8.4-G-20
- Page 96 and 97:
LSDW speakers are located throughou
- Page 98 and 99:
2.3.5.2 Steam and Condensate System
- Page 100 and 101:
2.3.5.4 Domestic Process Water Syst
- Page 102 and 103:
component (Schedule 40 pipe with 6-
- Page 104 and 105:
18 19 20 21 22 23 24 25 Building 99
- Page 106 and 107:
i THIS PAGE INTENTIONALLY LEFT BLAN
- Page 108 and 109:
the successful completion of a PSC'
- Page 110 and 111:
hazards analysis approach to be use
- Page 112 and 113:
Site Integrating Management Contrac
- Page 114 and 115:
The Criticality Safety program is e
- Page 116 and 117:
safety SSCs relies on the developme
- Page 118 and 119:
3.14 RADIATION PROTECTION The Radia
- Page 120 and 121:
activities and hazard assessment an
- Page 122 and 123:
18 19 20 21 22 23 24 25 26 27 28 29
- Page 124 and 125:
*I L\ '. '/ CHAPTER 4 HAZARD AND AC
- Page 126 and 127:
c THIS PAGE INTENTIONALLY LEFT BLAN
- Page 128 and 129:
pertinent to FSAR preparation, haza
- Page 130 and 131:
Facilities, DOE-HDBK-30 10-94 (Ref.
- Page 132 and 133:
PDC is the plume duration correctio
- Page 134 and 135:
0 Hazard Warning - The availability
- Page 136 and 137:
For hazardous materials that did no
- Page 138 and 139:
4.4.2 Hazard Classification The DOE
- Page 140 and 141:
scenarios. A total of 37 event tree
- Page 142 and 143: Revision 1 Scpinnher 19% (2) extrem
- Page 144 and 145: determined to represent a Standard
- Page 146 and 147: The extremely unlikely impact of a
- Page 148 and 149: 750 Pad tank farm that migrates to
- Page 150 and 151: 4 3 M a p: X - a E 0 U N U
- Page 153 and 154: 4.6 RISK DOMINANT ACCIDENT SCENARIO
- Page 155 and 156: A"" and Room 170 (including connect
- Page 157 and 158: area, or the Building 996 waste sto
- Page 159 and 160: consequence is low (0.084rem). If'
- Page 161 and 162: ! Movernent of waste containers fro
- Page 163 and 164: The risk and conseauences of Punctu
- Page 165 and 166: i ’ i, ! U” In summary, removal
- Page 167: 4 2 3 k J M fi .I 4 2 n
- Page 171: ch ch
- Page 174 and 175: I 1 I a rj i Y 4 d L J
- Page 178 and 179: 3 ci 3 N n i
- Page 180 and 181: 4.8 SAFETY ANALYSIS ASSUMPTIONS AND
- Page 182 and 183: W 3
- Page 184 and 185: c: --c m m 3
- Page 186 and 187: I f dl
- Page 188: c 3
- Page 192: I I I
- Page 200 and 201: 4.9 REFERENCES 1 Safety Analysis fo
- Page 202 and 203: THIS PAGE "'TIONALLY LEFT BLANK
- Page 204 and 205: 4 THIS PAGE INTENTIONALLY LEFT BLAN
- Page 206 and 207: hutornatic Plenum Deluge System 6.2
- Page 208 and 209: e ;j vl \ \ d 0 c
- Page 210 and 211: d \ \ m 8 \ \ -1 T u rA -: cr,
- Page 212 and 213: \ 4 I \ I
- Page 214 and 215: A 5 .E .
- Page 216 and 217: L - .- a G . P 4 .q s 3 Y 4 c
- Page 218 and 219: x .II L Y z v) I 0 L Y f s $ .I Y e
- Page 220 and 221: el s c-! v) s - el 0 < c-! n 0
- Page 222 and 223: I ‘ I I M
- Page 224 and 225: w .I L Y : m I 0 L Y G s $ .I Y Q Y
- Page 226 and 227: z .LI *., P 8 y1 2 N v N
- Page 228 and 229: ^-I 7 Revision I Smtember 1999 Sate
- Page 230 and 231: THIS PAGE INTENTIONALLY LEFT BLANK
- Page 232 and 233: THIS PAGE INTENTIONALLY LEFT BLANK
- Page 234 and 235: The second phase for identifying sa
- Page 236 and 237: Table 5-1 provides the matrix reIat
- Page 238 and 239: SI I I I
- Page 241: 5.2.1 SC-1/2 SSCS This section summ
- Page 246 and 247:
- ri 0 Y s/ V ci I -
- Page 248:
f:, ‘5-
- Page 251 and 252:
Y -I
- Page 253 and 254:
=REFERENCES 1 Safety Analysis for t
- Page 255 and 256:
" w- APPENDIX A BUILDING 991 COMPLE
- Page 257 and 258:
5.3 ........ 5.3.3 Specific Control
- Page 259 and 260:
1. USE AND APPLICATION The TECHNICA
- Page 261 and 262:
TERM DEFINITION DESIGN FEATURES Tho
- Page 263 and 264:
TERM DEFINITION SUSPEND OPERATIONS
- Page 265 and 266:
1.3 SAFETY LIMITS/LMTING CONTROL SE
- Page 267 and 268:
implemented without prior DOE-RFFO
- Page 269 and 270:
I 1.2 LOGICAL CONNECTORS (continued
- Page 271 and 272:
3./4. LIMITING CONDITIONS FOR OPERA
- Page 273 and 274:
LCO 3.0.1 LCOs Shall Be Met LCOs sh
- Page 275 and 276:
LCO 3.0.7 BASIS Revision Septcmher
- Page 277 and 278:
SR 4.0.2 Frequencies Each SR inspec
- Page 279 and 280:
REQUIRED ACTIONS: CONDITION D. Loss
- Page 281 and 282:
3./4. LIMITING CONDITIONS FOR OPERA
- Page 283 and 284:
BASES APPLICATION TO SAFETY ANALYSI
- Page 285 and 286:
BASES REQUJRED The four-hour COMPLE
- Page 287 and 288:
BASES REQUIRED ACTION B. 1 (continu
- Page 289 and 290:
BASES REQUIRED ACTION C. 1 (continu
- Page 291 and 292:
BASES REQUIRED ACTION C.3 (continue
- Page 293 and 294:
BASES REQUIRED LCO 3.1 will not be
- Page 295 and 296:
BASES REO UIRED ACTION E 2 Revision
- Page 297 and 298:
SURVEILLANCE REQUIREMENTS BASES SR
- Page 299 and 300:
CONDITION C. Dewadation or loss of
- Page 301 and 302:
. 3.2h.2 BUILDING 991 COMPLEX FILTE
- Page 303 and 304:
BASES BACKGROUhD Thi: south ixiaste
- Page 305 and 306:
BASES APPLICATION TO SAFETY ANALYST
- Page 307 and 308:
BASES AjPPLICABILllY 7122 SUSPEND O
- Page 309 and 310:
BASES REO U1RE.D ACTION A. 1 [conti
- Page 311 and 312:
BASES REOUIRED ACTION C.2 {continue
- Page 313 and 314:
BASES REOUIRED ACTION F I UDO~ bloc
- Page 315 and 316:
SURVEILLANCE REOUIREISfEXTS BASES S
- Page 317 and 318:
REOUIRED ACTIONS: CONDITION C. REQU
- Page 319 and 320:
3.M. LIMITENG CONDITIONS FOR OPER.A
- Page 321 and 322:
BASES APPLICATION TO SAFETY ANALYSI
- Page 323 and 324:
BASES REOUIKE E> LCO 3.3 will noc b
- Page 325 and 326:
BASES REOUIFED ACTION B.2.1 (contin
- Page 327 and 328:
BASES ~ ~ ~~ ~ ~ REWIRED ACTION C.2
- Page 329 and 330:
SGRVEILLAXCE REUUIREhfEXTS BASES SR
- Page 331 and 332:
5 ADMINISTRATIVE CONTROLS 5.0 GENER
- Page 333 and 334:
5.0.4 Upon identification that an A
- Page 335 and 336:
APPLICABILITY: Adequate staffing fo
- Page 337 and 338:
AOL 1 POC and waste containers rece
- Page 339 and 340:
AOL 3 Metal waste containers receiv
- Page 341 and 342:
CONDITION 2. Discovery that waste c
- Page 343 and 344:
AOL 6 SNM, POC, and waste container
- Page 345 and 346:
AOL 8 An operations control program
- Page 347 and 348:
CONDITION 3. Discovery that operati
- Page 349 and 350:
AOL 9 A combustible material and ig
- Page 351 and 352:
1 CONDITION 1 REQUIRED ACTION 4. Ig
- Page 353 and 354:
CONDITION 2. Flammable gas location
- Page 355 and 356:
ACTIONS: CONDITION 1. Failure of an
- Page 357 and 358:
5.5 EMERGENCY RESPONSE 5.5.1 Requir
- Page 359 and 360:
5.7 FIRE PROTECTION 5.7.1 Requireme
- Page 361 and 362:
5.9 CONFIGURATION MANAGEMENT 5.9.1
- Page 363 and 364:
5B.0 General Application BASES (con
- Page 365 and 366:
BASIS: The minimum staffing require
- Page 367 and 368:
5B.2.3 Specific Controls or Restric
- Page 369 and 370:
AOL 2 In addition, the FSAR Safety
- Page 371 and 372:
AOL 4 BASIS (cont’d) NOTE: Revisi
- Page 373 and 374:
AOL 6 BASIS (cont’d) NOTE: AOL 7
- Page 375 and 376:
AOL 8 BASIS [cont' d) Revision 1 SL
- Page 377 and 378:
AOL 8 BASIS (cont'd) Revision L Scp
- Page 379 and 380:
5B.3.3 Specific Controls or Restric
- Page 381 and 382:
AOL 10 BASIS (cont’d) Flammable g
- Page 383 and 384:
5B.4.3 Specific Controls or Restric
- Page 385 and 386:
5B.7 FIRE PKOTECTlON BASES 5B.7.1 R
- Page 387 and 388:
5B.9 C'ONFIGUIXAI'ION MANAGEhlENT B
- Page 389 and 390:
R 4 +"t, vti Walls and Concrete Roo
- Page 394:
a, 2 U a, 2 i m x
- Page 397 and 398:
W m' c 0 0 0
- Page 399 and 400:
Revisions Updated Section 1.7 to in