BASES<br />

REOUIRED<br />

ACTION A. I<br />

[continued)<br />

Revision L<br />

September lcB9<br />

~ ~<br />

Upon loss <strong>of</strong> <strong>of</strong>f-site Dower to the BIJILDIYG 451 COMPLEX. the Buildinrr 441<br />

FEW exhaus? fans mav stou ntmiing mcl tile credited filtercd exhaust safcts<br />

bction inw be lost Alternate electric Isower mat- be supdied bv a dicrzl<br />

generator in Building 989. The diesel qencrator mat- keep the FE’\:S nmning and<br />

mainrain the filtered exhaust safety fitnction. However. a diesd generator that is<br />

not inaintained and tested per requirements in TSRs is considercd to have hiah<br />

unavailabifiw (i.e.. failure to start) and unreli&ili@ (i.e.. failure to renmn<br />

running). Therefore. the loss <strong>of</strong> oE-sitc Dower is considered to be equivalent EO a<br />

failurz <strong>of</strong> the FEVS (i.e..no uower to the eshmst fans). The correspondinp<br />

REOMRED ACTIOX associated with a loss <strong>of</strong> the safetv hction is auulied to<br />

the situation where the BUZLDTKG 991 COMPLEX has lost a11 electric power or<br />

is opeminz on alternate nower -suuulied bs the diesel generator<br />

If die FEVS is not OPERABLE in die container stomelstaeina arm. the hcility<br />

shall SUSPEND OPERATIONS in the AFFECTED AREAS within four hours<br />

The SUSPEND OPERATIOXS REQUIRED ACTION is a measure to reduce the<br />

likelihood <strong>of</strong> otxrational accidents in the AFFECTED AREAS. The suspension<br />

<strong>of</strong> ouerations does not reolace the filtcred exhaust safetv hction <strong>of</strong> the Fm’S bot<br />

attenmtts to mainrain an eciuit-dent risk bv reducing the likelihood <strong>of</strong> fire. spill.<br />

puncture, and hydrogen exoiosion scenxios. The suspension <strong>of</strong> ooerations does<br />

not Dreclude firs initiation. Energized efecuid svstems in the fxififx dwws<br />

have the Dotentid to initiate fires. However- the likelihood <strong>of</strong> dect-ricd system<br />

induced fires is considered to be simnificantlv less than fires initiated bv o~emtions<br />

(e..~.. maintenance activities). paiticularlv in the situation where faCi1it.i- <strong>of</strong>f-site<br />

power is lost.<br />

As discussed in the AuDticabilitv section above. movements <strong>of</strong> SNhl Twe B<br />

sbuine; contiiners and POCs are not suspended. Also. movements <strong>of</strong> waste<br />

containers froni a stwed location in Room 170 to a transport vehicle at the<br />

Room I70 dock are not suspended.<br />

The four-hour COMPLETION TIh4E associated with the SUSPEND<br />

OPERATIOXS REWIRED ACTION Drovides adequate time for facilitv<br />

rnanaecment to inform the workers <strong>of</strong> the required termination and for the workm<br />

to safelv tenninate the work.<br />