17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3J4. LIILlXTfNG CONDXTlUKS FOR OPERATXON AND SURVEILLANCE<br />

REO UPREMENTS<br />

3.3 LII~~~TING cowmrox FOR OPERATION: Buumw 992 COMPLEX<br />

AUTOMATIC PLENLTM DELUGE SYSTEMS<br />

LCO: The RUILDIXG 991 COMPLEX Automatic Plenum Deluge Svstens Sh-aA<br />

ne OPERABLE, With The Following:<br />

APPLICA321LITY:<br />

CONDITION<br />

A. Automatic Plenum Delune<br />

System in the<br />

Building 991 plenum not<br />

OPER43LE.<br />

B. Automatic Plenum Deiuge<br />

Svstem in the<br />

Building 985 plenum not<br />

OPERABLE.<br />

Revision 1.<br />

Swtcmher 1990<br />

1. The Building 991 exhaust ventilation svsteni Dienum shall have a deluge<br />

system composed <strong>of</strong> heat detectors, automatic deluge actuation, and manual<br />

operation cambilitv.<br />

2. The Building985 exhaust ventilation system plenum shall have a deluge<br />

svstem composed <strong>of</strong> heat detectors. automatic deluge actuation. and manual<br />

operation cavabiiitv, if the exhaust ventilation system is intended to be used<br />

At all times in the Building 991 Filtered Exhaust Ventilation System<br />

plenum and in the Building 985 Filtered Exhaust Ventilation System<br />

plenum if the Buildinn 985 ventilation system is intended to be used<br />

A4. 1<br />

REOUIRED ACTION<br />

Terminate ail hot work in<br />

AFFECTED AREL4S.<br />

- AND<br />

A.2 Restore Automatic Plenum<br />

Deluge System<br />

B. I<br />

- OR<br />

OPEFUBELITY.<br />

Stop operation <strong>of</strong> the<br />

Building 985 exhaust<br />

ventilation svstem main<br />

exhaust fans.<br />

B.2.1 Terminate all hot work in<br />

AFFECTED AREAS.<br />

AND<br />

B.2.2 Restore Automatic Plenum<br />

Deluge Svsteni<br />

OPERM3ILITI’.<br />

COhCLETIOX TIME<br />

2 hours.<br />

45 daw.<br />

3 hours.<br />

2 hours.<br />

45 dam.<br />

A-62 Buildmg 991 Complex FShR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!