BASES<br />

REOUIKE E> LCO 3.3 will noc be met if the Automatic Plenum Deiuw Svstem is not<br />

ACTION A.2 OPERABLE in the Building 391 FEVS Dlenuin. The abseiiccz <strong>of</strong> the deluge<br />

svstem function in the Building 99i FEVS plenum pro.;ides the potential for 3<br />

large faCi1it.i. fire to ininact the Building 991 FEW filters. The Automatic Plenum<br />

Deluge Svstem functions to cool the air entering the denum andior to suppress<br />

hot ernbers and flving brands from igniting the HEPA filters. Without the deluge<br />

function. the likelihood <strong>of</strong> large fires in the facility intDactiw the filters in die<br />

plenum is increased. The facility is .still urotected if the ddon <strong>of</strong> the not<br />

OPERABLE confieuntion is decreased sficientlv to <strong>of</strong>fset the increased<br />

likelihood <strong>of</strong> large h s imuacting the HEPA fdters.<br />

Revision 1<br />

September 1999<br />

If the Automatic Plenum Deluge Svstem is not OPERABLE. the facility shall<br />

restore the function withim 45 days. The restomion <strong>of</strong> the fiiint+ou within 3<br />

limited time Deriod is a measure to limit the likelihood <strong>of</strong> fire initision in the<br />

facilitv imDacting the HEPA filters. REOLWD ACTION A.l is identified to<br />

Educe the likelihood <strong>of</strong> Ime f i initiation ~ during, the time taken to restore the<br />

Automatic Plenum Deluge Svstem.<br />

The 45 dav COMPLETION TIME associated with the rzstoration <strong>of</strong> the plenum<br />

deluge function provides adequate time for faciliw manaeenient to repair maw <strong>of</strong><br />

the delwe wstem Gled confieurations. Readilv available spare uar~s can be<br />

obtained and simule remidmaintenance actikities can be conducted within the<br />

45 day ueriod.<br />

The 45dav COMPLETION TIME does not result in undue risk due the low<br />

likelihood <strong>of</strong> the Automaric Plenum Deluge Svstem ever beinn needed or used<br />

Fires large enough to imuact the filters in the ventilation system are not considered<br />

to be credible in the sdetv analysis: however. the delwe svsteni is included as 3<br />

mitigative featzlre to Drovide DEFEVSE-IN-DEPTH Droixtion against the<br />

possibilitv <strong>of</strong> manahzed situations leadinp to a iae fire. In addition. the<br />

possibilitv <strong>of</strong> hot ember and fl\ins brand ca~ture bv the HEPA filters during<br />

smaller fires does exist. Therefore. the duntion <strong>of</strong> time for the function beine not<br />

OPERABLE should be limited and is set at 45 days due to the lower likelihood <strong>of</strong><br />

svstern use. D ~ C U I given ~ I ~ the termination <strong>of</strong> hot work as rewired in<br />

REOLrLRED ACTION A.I. However, the REQUIRED ACTION to restore the<br />

hction is expected to be achieved as soon as reasonable. even if this is<br />

significantly less than the assigned COMPLETtOK TIME. The IS dab<br />

COMPLETIOX TIME shodd not be usttd for operational convenience.<br />

A-69 Building 991 Complex FSAR<br />