17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.0.4 Upon identification that an AC VIOLATION exists, the following actions are required:<br />

(cant)<br />

a. Ensure a safe facility configuration for violations associated with specific<br />

controls or restrictions (i.e., suspension <strong>of</strong> operations in the affected areas); and<br />

b. Notify DOE-RFFO <strong>of</strong> the VIOLATION in accordance with occurrence reporting<br />

requirements.<br />

5.0.5 AC 5.0.5 establishes an exception to mandatory compliance with requirements in the<br />

ADMINISTRATIVE CONTROLS when designated SSCs or areas have been OUT OF<br />

COMMISSION in accordance with the conditions specified in the TSR definition<br />

section. OUT OF COMMISSION SSCs or areas may be considered to be<br />

administratively removed from the BUILDING 991 COMPLEX and no longer subject<br />

to the TSR requirements.<br />

Revision J,<br />

Sentemher 1999<br />

A-79<br />

Building 991 Complex FSAR<br />

Appendix A<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!