17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BASES<br />

REOUIRED<br />

ACTION F I<br />

UDO~ blockwe <strong>of</strong> the filters in the Building 991 FEW. che filtered exhaust safets<br />

function may be lost. If the FEVS is not OPEIUBLE in the container<br />

[continued) stomze/winp areas. the faciliw shall SUSPEED OPERATlONS in thx<br />

AFFECTED AREAS within four hours The SUSPEND OPERATIONS<br />

REOUIRED ACTIOK is a measure to reduce the likelihood <strong>of</strong> onemtiond<br />

accidents in the AFFECTED AREAS. The suspension <strong>of</strong> o~erations does not<br />

replace the filtered exhaust sdew fimction <strong>of</strong> the FEVS but attempts to mamttiin<br />

an eauivalent risk bv reducing the likelihood <strong>of</strong> fire. spill, uuncture. and hydrogen<br />

exdosion scenarios. The sumension <strong>of</strong> omrations does not preclude fin<br />

initiation. Energized electrical svstems in the facilitv alwavs have the potential to<br />

initiate fires. However, the likelihood <strong>of</strong> electrical system indud fires is<br />

considered to be siznificantiv iess than fires initiated bv operations<br />

&.g. - maintenance activities).<br />

Revision L<br />

Scptmher 1999<br />

See the discussion under REOUmED ACTION A.l dealing with iustification <strong>of</strong><br />

the four-hour COMPLETION TIME and the scwe <strong>of</strong> the SUSPEND<br />

OPERATIOIS REQUIRED ACTION.<br />

A-59<br />

Buildng 991 Complex FSAR<br />

Appendix A<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!