1 Revisions<br />

NSTR-011-98. Safety Analysis for the Building 991 Complex FSAR, Revision 2<br />

Executive<br />

summary<br />

Chapter 1<br />

Chapter 2<br />

Chapter 3<br />

Chapter 4<br />

Chapter 5<br />

Chapter 6<br />

Chapter 7<br />

Updated to incorporate changes made to document<br />

Nochangesmade.<br />

Atiachment 4<br />

MW-I 19-99<br />

September IS, 1999<br />

Page 3 <strong>of</strong> 3<br />

Updated to incorporate the B776/777 BIO approach for determining dose consequences to<br />

the IW.<br />

Updated Table 6 1 to clarifj that the WG Pu equivalent gram loading used for Type B<br />

containers is an assumption <strong>of</strong> the analysis and is not a control that should be specified in the<br />

TSRs.<br />

Updated appropriate accident scenarios based on new approach for qualitatively evaluating<br />

the dose consequences to the JW.<br />

Specifically credited the automatic sprinkler system, flow aldfire department response,<br />

smoke detectoxdfire department response for Facility Fire 2.<br />

Specifically credited the flow alWfire department response for Facility Fire 4.<br />

Added Features F26 and F27 for the flow alarmdike department response and smoke<br />

detectoxdfire department response.<br />

Updated accident scenario summary tables based on changes to the accident scenarios.<br />

Added discussion to reduce the likelihood <strong>of</strong> a puncture <strong>of</strong> a Type B or POC to Beyond<br />

Extremely Unlikely.<br />

Added discussion concerning the solubility class for the POC puncture evaluation<br />

Enhanced discussion on number <strong>of</strong> drums that could be breached from a facility explosion<br />

event.<br />

Added accident scenario for a heaw snow event-induced mill. No new controls identified.<br />

Updated Risk Dominant Accident Scenario discussion. Used this d o n to formally credit<br />

the building’s filtered exhaust ventilation system. By crediting the filtered exhaust<br />

ventilation system and using the B776/777 BIO IW dose consequence approach, the number<br />

<strong>of</strong> risk dominant accident scenarios was reduced from 5 to 3.<br />

Updated Table 110 to add all scenarios for the applicable assumption/feature/requhement.