17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REOUIRED ACTIONS:<br />

CONDITION<br />

C. REQUIRED ACTTONd<br />

COMPLETTON TIME can<br />

not be met in REOLmED<br />

ACTIONls) A.2 or B.2.2.<br />

Revision L<br />

Scptcmher 1993<br />

C. I<br />

REOUIRED ACTION<br />

Submit an action plan and<br />

schedule for plenum deluge<br />

system restoration to the<br />

DUE-RFFO if the svstem is<br />

expected to remain<br />

OUT-OF-SERVICE for UP to<br />

and including 120 daw.<br />

- OR<br />

C.2 Submit a Justification for<br />

Continued Operation (JCO) for<br />

ha\rinrz a not OPERABLE<br />

plenum deluge system to the<br />

DOE-RFFO if the system is<br />

expected to remain or remains<br />

OUT-OF-SERVICE for more<br />

than 120 dam<br />

COMPLETION TIME<br />

45 davs from the time<br />

<strong>of</strong> entry into<br />

COSDTTTOX A or R.<br />

45 davs from the time<br />

<strong>of</strong> entm into<br />

COXDITIOK A or B<br />

ifRE@UIRED<br />

ACTION C.1 is not<br />

performed;<br />

120 davs from the<br />

time <strong>of</strong> entm into<br />

CONDITIOX A or B<br />

if REQUIRED<br />

ACTION C.1 is<br />

performed.<br />

A-63 Building 991 Complex FSAR<br />

Appqndix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!