17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AOL 7 All pallets <strong>of</strong> waste containers that are stacked to a third or fourth tier shall be<br />

banded.<br />

APPLICABILITY: At all times in the BUILDING 991 COMPLEX<br />

ACTIONS:<br />

1 CONDITION I REQUIRED ACTION<br />

I I I i<br />

1. Discovery that waste containers<br />

stacked on the third or fourth<br />

tier and not banded.<br />

COMPLETION 1<br />

I<br />

I<br />

1. Remove the non-banded pallet <strong>of</strong> 8 hours.<br />

containers from the third or fourth tier.<br />

- OR<br />

2. Band the pallet <strong>of</strong> containers and replace<br />

in the third or fourth tier, if necessary.<br />

8 hours.<br />

I<br />

;<br />

I<br />

i<br />

1 I I 1<br />

Revision 1<br />

Scmernber 1999<br />

A-90 Building 991 Complex FS AiC<br />

Appendix -4<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!