CONDITION<br />

C. Dewadation or loss <strong>of</strong> the<br />

Building 985 exhaust<br />

ventilation system<br />

filtration capabilinr.<br />

D. Differential pressure in the<br />

Buiiding 991 exhaust<br />

ventilation system plenum<br />

is < 0.5 in. W.P. negative<br />

with resDect to<br />

atmospheric reference.<br />

E. Differential pressure in<br />

Room 170 is < 0.02 in.<br />

w.g. negative with respect<br />

to atmospheric reference.<br />

F. Differential uressure<br />

across the Building 991<br />

exhaust ventilation system<br />

plenum is > 4 in. w.g<br />

negative.<br />

REOTJIRED ACTiON<br />

C. 1 SUSPEND OPERATIONS in<br />

the AFFECTED AREQLS.<br />

OR<br />

C.2 Stop operation <strong>of</strong> Building 985<br />

exhaust ventilation system<br />

main exhaust fans.<br />

D. 1 SUSPEND OPERATIONS in<br />

the AFFECTED AWAS.<br />

E. 1 SUSPEND OPERATIONS in<br />

Rooms 134, 135. 147. and 170.<br />

F,1 SUSPEND OPERATIOXS in<br />

the AFFECTED AREAS.<br />

4 hours.<br />

2 hours.<br />

I hours.<br />

4 hours.<br />

I hours.<br />

A-45 Building 99 1 Complex FS AR<br />