BASES<br />

REOUIFED<br />

ACTION B.2.1<br />

(continued)<br />

REOurRED<br />

ACTION B.2.2<br />

Revision 1.<br />

Soptembcr 199?<br />

?he two-hour COMPLETION TIME associated with thz tznniriation <strong>of</strong> hot wri,<br />

provides adequate time for facilih; matiaemcnt to inform the workers <strong>of</strong> the<br />

reaujred tenniiiation and for die workers to safelv terminate tlic work The<br />

termination <strong>of</strong> these activities does not negate any fire watch requirements<br />

associaxed with the oripinal activity. That is if the hot work Demit stiuulattzd a<br />

continuous fire watch €or eight iioun to monitor equipment whik it is cooling. thc<br />

teminatioii <strong>of</strong> the activitv would not relax the requireineiit for a continuous fire<br />

- watch.<br />

"he two-hour COhIPLETIOX TULE does not result in undue risk due to tk<br />

alreadv continuous monitoring <strong>of</strong> the actit-ities bv &e worken involved in thc<br />

activities. However. the REOUIRED ACTION to terminate all hot \%ark in the<br />

AFFECTED AREAS is expected to bc imulemented as soon as reasonably<br />

achievable. even if this is significantly less than the assimed COMPLETION<br />

TIME. The two-hour COMPLETION TIME should not be used for ouerational<br />

convenience.<br />

LCO 3.3 will not be met if the Automatic Plenum Defwe Systzm IS RO~<br />

OPERABLE in the Building 985 FEC'S Dlenutn. The absence <strong>of</strong> the dclwc<br />

sstm fuiicuon in the Building 985 FEVS plenum Drovides the Dotentid for 3<br />

large fkcilitv fire to irnDact the Building 985 FEW filters if the FEVS is beinq<br />

used. The Automatic Plenum Deluge Svstem bctions to cool the air entering the<br />

plenum andor to sumress hot embers and flving brands from igniting die HEPA<br />

filters. Without the deluge function. the Iikeliood <strong>of</strong> lave fires in the fadm<br />

imDasxhs the filters in the DIenum is increased. The f$Cilitv is still urotected if<br />

the duration <strong>of</strong> the not OPERABLE configuration is decreased sufficiently to<br />

<strong>of</strong>fset the increased likelihood <strong>of</strong> lame fires im.tlacIing the HEPA fdters.<br />

If the Automatic Plenum Delwe Swtem is not OPERABLE. the facility shall<br />

restore the hction within 45 days. The restoration <strong>of</strong> the fiinction within 3<br />

limited time period is a measure to Limit the likelihood <strong>of</strong> fire initiation in thc<br />

facilitc. inlDactine the HEPA filters. REOUIRED ACTION 8.2.1 is identified to<br />

nduce the likelihood <strong>of</strong> Iaree fire initiation during the time taken to restore the<br />

Automatic Plenum Deluge System.<br />

The 45 dav COMPLETION TIME associated with the estomion <strong>of</strong> the plentm<br />

deluge function Drovides adequate time for facilitt. management to repair mmc ot<br />

die deluoe svsteni &filed coniiwrations. Readily availabie ware arts can bc<br />

obtained and simple rwairiniaintenmce actit-ities can be cmductcd within th:<br />

45 day Period.<br />

A-7 1 Building 991 Complex FSAR<br />

Appendix 4