17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REQUIRED ACTIONS:<br />

CONDITION<br />

D. Loss <strong>of</strong> Automatic<br />

Sprinkler System Flow<br />

Alarm transmittal<br />

capability to the Fire<br />

<strong>Department</strong> for Riser<br />

System B.<br />

E. Loss <strong>of</strong> Smoke Detection<br />

Alann transmittal<br />

capability to the Fire<br />

<strong>Department</strong>.<br />

Revision 1;<br />

Scptcmber 1939<br />

REQUIRED ACTION 1 COMPLETION TIME<br />

D. 1 Establish a fue watch in<br />

accordance with Site<br />

requirements in AFFECTED<br />

AREAS.<br />

AND<br />

D.2 SUSPEND OPERATIONS in<br />

AFFECTED AREAS.<br />

E I Establish a fire watch in<br />

accordance with Site<br />

requirements ki AFFECTED<br />

AREAS<br />

AND<br />

E.2 SUSPEND OPEMTIOXS in<br />

AFFECTED ARE,4S.<br />

4 hours<br />

4 hours.<br />

8 hours.<br />

4 hours<br />

A-25 Building 991 Complex FSAR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!