BASES<br />

APPLICA'TION<br />

TO SAFETY<br />

rzN At YSI s<br />

('continued)<br />

Thz FEVS is credited in combination with an AOL control to have the dock doors<br />

closed during all operations conducted in Room 170 exuceut for rc'ceiving and<br />

shiauiiig ooemions. It is intcnded that containers (otber than SKM Tvpc E<br />

shiapinp conkiiners) will be immediatek swed in Room 170 at receipt until he<br />

dock doors are closed. Follouine door <strong>closure</strong>. containers are moved to stowe<br />

locations. Also. it is assumed that containers (other than SNM Tvpe B shiDpinq<br />

containers) will be stared in Room 170 in preparation for shipping prior to thc<br />

dock doors being opened for placement on the msport vehicle.<br />

LCO 3.2 The RUlLDTNG 991 COMPLEX Filtered Exhaust Ventilation Svsteins Shall Be<br />

OPERABLE.<br />

For the FEVS to be OPEIIWBLE. the system must maintain a negative prcssurc in<br />

the areas where container ouerations. other than receipt and shipment, ari:<br />

conducted. A neeative pressure differential in the inlet portion <strong>of</strong> the<br />

Building 991 plenum indicates that an FEVS fan is operating -4 negatrw<br />

differential uressure across the Buildinp 991 ulenum indicates that KEPA filters<br />

are Drovidina resistance to flow and are mesent If an FEVS h is operating and<br />

the FEVS ductwork is relativelv intact, the north container scoraxe:'staqina areas<br />

and the Bidding 996 connected area will be at a negative pressure relative to ;111<br />

atniosDheric reference. The south waste container storage area nesahve<br />

differential DESSUIZ must be verified indrmendentlv due to the FEW indirect<br />

rather than direct, SUDDOT~ <strong>of</strong> the south waste container dome areas<br />

For the FEVS to be OPERABLE. the svstem must also filter facilitsr exhaust air<br />

if the Building 991 exhaust plenum filter m e efficiency has been verified. air<br />

exitin,z the faciliW via the Building 991 FEVS is fil?cred. If the Building 985<br />

FEVS is milized and one <strong>of</strong> the two exhaust olenimi filter stase efficiency has<br />

been verified. air exiting the facilih- via the Building 9SS FNS is filtcred<br />

APPLICABILITY This LCO is apulicable to those oortions <strong>of</strong> the BUILDING 991 COMPLEX.<br />

other than Room 166, that are interior container stome/sm;ing mas<br />

lie., Building 991 north and sot& container stome/staging maszs. Buildinn 948<br />

{Room 300 and Comdor A). and Building 996 (Builditlo 996 arid Comdor B))<br />

The LCO is amlicable & dl times.<br />

Revision j,<br />

Smtcm bcr 1999<br />

DZikrential pressure requiirenients do iiot hax to be inaintained during normal<br />

differential pressure fluctusions <strong>of</strong> less than 5minutrts in duration Wild<br />

conditions outside the facilitv mal' lead to differential DrZssure fluctuations As<br />

loria as tt:c fluc~3tions are <strong>of</strong> a short duration. there is no indication that the<br />

svstern is iiot OPERABLE. Tne Room 170 pressure differential rtguAcnicnts cig<br />

not havc to be maintained white dock doors m open durinv receipt and shipment<br />

mentions. The safety analvs~s evalu3tzs accidents occurring while dock doors a-e<br />

open as unfiltered releases<br />

A-52 Building 991 Complex FSAR<br />

Appendis .4