BASES<br />

REO UIRED<br />

ACTIONB 1<br />

The Building 985 exhaust ventilation svstem filt~~ti~~i capabilitv is o~ih necrssan'<br />

ifthe system is being used. Tlic 5uildine 985 exhaust ventilation system erovides<br />

an additional exhaust path from the facih bevond that resdtiiia from operatiori<br />

<strong>of</strong> the Building 991 exhaust ventilation svscem. If the Bidding 985 Automatic<br />

Plznum Deluve Svsteni is not OPERABLE. the facilits. shall stop opzration <strong>of</strong> the<br />

Building 985 exhaust ventilatioii svsteni main exhaust fats within hio hours<br />

Terminatiori <strong>of</strong>the f$n use will rierrate the need for a system to Drotcct die HEPA<br />

filtration in the Buildinn 985 FEW since the additional exhaust ~ath from the<br />

facilitv provided bv the Buildin2 985 FEVS vi31 no longer exix Simificant<br />

aniounts <strong>of</strong> fire generated heat and particulates will not be dmwn into a ventilation<br />

svstem that is not onerating. This is an alternative REOUIRED ACTIOK to<br />

termination <strong>of</strong> hot w70rk and restoration <strong>of</strong> the safetv function.<br />

The two-hour COMPLE-TIOX TIME associated ttith stoDDinP the Building 985<br />

exhaust fans provides adeauate time for facilie management to contact the<br />

appropriate workers to uerform the task. The REOUIRED ACTION to stop the<br />

Buildiua985 fans is expected to be implemented as soon as reasonabh<br />

achievable. even if this is sionificantlv less dim the assigned COMPLETION<br />

TIME. The two-hour COMPLETION "ME should not be used for operatronal<br />

convenience.<br />

REOUDRED LCO 3.3 will not be met if the Automatic fhum Delune System is not<br />

ACTION B2.1 OPEReLE in the Building 985 FEVS pleniii. "lie absence <strong>of</strong> the deluge<br />

svstem fimctioii in the Building 985 FEVS D~CZWII provides the potential for a<br />

large faciliw fire to impact the Buildine: 985 FEVS filters if the FEVS is beins<br />

used. The Automatic Plenum Dzlugt System functions to cool the air enterinr! the<br />

plenum andor to suppress hot embers and flviing brands from imitine the HEP.4<br />

filters. Without die deluge function, the iikelihood <strong>of</strong> 1arc.e fires in the %ciIin<br />

irnnactinn the filters in the denum is increased. The E3ciliw is still protected if<br />

the likelihood <strong>of</strong> fire initiation is decreased sufficiznth to <strong>of</strong>fset the increased<br />

likelihood <strong>of</strong> lame fires impactinn the HEPA filters.<br />

Revision 1<br />

Scpkmher 1999<br />

Ethe Automatic Plenum Deluge Svstem is not OPEK4BLE. the facilitv stid1<br />

temunate all hot work being conducted in the AFFECTED AREAS nitflin<br />

nvo-hoim. The termination <strong>of</strong> hot work (ie. sDark;hear/flame producing work) IS<br />

a measure to reduce the likelihood <strong>of</strong> fire initiarion in the facilitt-. The terminawn<br />

does not dace the filter protection function <strong>of</strong> the Automatic Plenum Deluge<br />

Svsteni but attemDts to maintain an equivalent risk bv reducing fire freauenc\<br />

The termination <strong>of</strong> hot work does not Dreclude fire initiation. Energized cle~tnal<br />

systems in die facifitv always have the potential to initiatr: fires. Therefor:,<br />

REOUIRED ACTION B.3.2 is identified to expedite the restoration <strong>of</strong> ri;:<br />

Automatic Plenum De1ug;c' System<br />

A-70 Building 99 I Complex FSAR 1<br />

Appendixri i