17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ACTIONS:<br />

CONDITION<br />

1. High heat release rate<br />

combustible material<br />

requirements not met while<br />

waste containers in storage in<br />

BUILDING 991 COMPLEX<br />

2. Combustible loading<br />

requirement not met while<br />

waste containers in storage in<br />

the BUILDING 99 1<br />

COMPLEX.<br />

J . Combustible material location<br />

requirement not met while<br />

waste containers in storage in<br />

the BUILDING 991<br />

COMPLEX.<br />

Revision 1<br />

Swtcmber I999<br />

REQUIRED ACTION<br />

1.1 E excess flammabldcombustible liquids.<br />

or plastic. remove excess<br />

flammabldcornbustible liquid or plastic<br />

material from waste container storage<br />

area.<br />

OR<br />

1.2 Meet requirements dealing with<br />

flammable/combuscible liquids or plastic<br />

material in waste container storage area.<br />

_. OR<br />

2.1<br />

2.2<br />

- OR<br />

3.<br />

1.<br />

- OR<br />

2.<br />

OR<br />

3.<br />

1. I<br />

1.2<br />

OR<br />

2.<br />

If flammabldcombustl7le liquids stored<br />

outside cabinets, remove improperly<br />

stored flammabldcombustible liquid from<br />

applicable areas (see BASES).<br />

OR<br />

_.<br />

Store flammabldcombustible liquid in<br />

NFPA approved cabinet.<br />

If fossil-fueled vehicle in storage area,<br />

remove fossil-fueled vehicle from<br />

interior waste container storage area.<br />

If wooden crate, remove wooden crate<br />

from interior waste container storage area.<br />

If wooden pallet@) used in storage,<br />

remove wooden pallet@) from waste<br />

container storage application.<br />

If combustible loading increased over<br />

FHA categorization, reduce transient<br />

combustible loading in waste container<br />

storage area.<br />

If combustibles within 5 feet <strong>of</strong><br />

containers, separate Combustible material<br />

from waste containers.<br />

_. OR<br />

Remove combustible material from waste<br />

container storage area.<br />

If flammable gas container stored in<br />

compiex, remove flammable gas<br />

container from applicable areas (see<br />

BASES) .<br />

A-96<br />

COMPLETION<br />

TIME<br />

24 hours.<br />

24 hours.<br />

4 hours.<br />

4 hours.<br />

1 hour.<br />

24 hours.<br />

4 hours.<br />

Per direction <strong>of</strong> Fire<br />

Protection.<br />

Z hours.<br />

1. hours.<br />

L hour.<br />

Building 99 I Complex FSAR<br />

Appendix A<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!