17.06.2013 Views

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

closure project manager - Document Request - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S LRkEIL LANCE REQLZEMEhT<br />

SR 4.2.1 Verify that the removal eficiencv is 2 99.9% for the<br />

Building 99 f exhaust ventilation svstem HEPA filter<br />

stage.<br />

SR 4.2.2 .As lonr! as the Building 985 exhaust ventilation system<br />

is intended to be used. verifv that the renioval efficiency<br />

is 2 99.9% for a Building 98.5 exhaust ventilation<br />

svstem HEPA filter stage.<br />

SR 4.2.3 Verify that the pressure differential in the Building 991<br />

exhaust ventilation svstem plenum is 2 0.5 in. w.g.<br />

nqative with respect to atmospheric reference.<br />

SR 4.2.4 Verifv that the uressure differential in Room 170 is<br />

2 0.02 in. W.Z. negative with resmct to atmosoheric<br />

. reference.<br />

SR 4.2.5 Verify that the pressure differential across the<br />

Building 991 exhaust ventilation system Plenum is<br />

5 4 in. w.g. negative.<br />

Revision 1<br />

Septcmher 1999<br />

~ Once<br />

FREQUENCY<br />

Once Der 18 months<br />

Once Der IS months.<br />

Der working shift.<br />

Once Der working shift<br />

and upon completion <strong>of</strong><br />

receipt or shipment<br />

operations in Room 170<br />

(Le.. closina dock door).<br />

Once per working shift.<br />

A-46 Building 991 Complex FSAR<br />

Appendix A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!