5B.4.3 Specific Controls or Restrictions<br />

BASIS: This AC applies to SC-3 SSCs in the BUILDING 991 COMPLEX identified in<br />

Table 3.<br />

Revision 4<br />

September 1999<br />

The FSAR Safety Analysis considered the following SSCs DEFENSE-IN-DEPTH<br />

sscs:<br />

0<br />

Fire Phones are available to allow communication <strong>of</strong> fires to the Fire <strong>Department</strong>;<br />

Water Gong Alarms on exterior <strong>of</strong> Building 9 91;d<br />

LSDW System in the BUILDING 991 COMPLEX,<br />

SC-3 SSCs provide DEFENSE-IN-DEPTH and worker safety for postulated facility<br />

fxe, spill, puncture, container explosion, facility explosion, and criticality accident<br />

scenarios.<br />

A-129<br />

Building 991 Complex FSAR<br />

Appendix A<br />