30.06.2013 Views

Introduction to Fire Safety Management

Introduction to Fire Safety Management

Introduction to Fire Safety Management

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Acts of Parliament, 6<br />

Approved Codes of Practice<br />

(ACoPs), 6–7<br />

EU/BS and industry guidance, 7<br />

Guidance notes, 7<br />

legal standards, 7–8<br />

Regulations and Orders, 6<br />

<strong>Fire</strong> (Scotland) Act 2005 (FSA), 17–18<br />

other supporting legislation, 16–17<br />

specifi c fi re and health and safety<br />

legislation, 8–16<br />

<strong>Fire</strong> hydrants, 354<br />

<strong>Fire</strong> incident controllers (FICs), 42,<br />

356–7<br />

confi rming buildings are clear, 261–2<br />

roll-call, 262<br />

sweep, 262<br />

deployment, 256–7<br />

availability, 256–7<br />

use of high visibility surcoat, 257<br />

role, 256<br />

grab bags, 256<br />

training, 257<br />

<strong>Fire</strong> investigation process, 300–1<br />

<strong>Fire</strong> loading:<br />

of some common commodities, 126<br />

within buildings, 126<br />

<strong>Fire</strong> marshals/fi re wardens, 41, 255–6,<br />

262<br />

deployment, 256<br />

example of responsibilities of, 266–7<br />

may undertake part of safety<br />

inspection, 273<br />

role, 255, 266–7<br />

emergency role, 255<br />

identifying fi re hazards, remove of<br />

report, 255<br />

moni<strong>to</strong>ring fi re protection<br />

measures, 255<br />

proactive and reactive, 255<br />

training, 256<br />

two distinct roles, 42<br />

<strong>Fire</strong>, preplanning <strong>to</strong> minimise<br />

environmental impact, 315–18<br />

emergency procedure, 316–17<br />

incident response plan (IRP), 316,<br />

324–7<br />

subjects <strong>to</strong> be included, 317<br />

producing an incident response<br />

plan, 317–18<br />

training <strong>to</strong> support the IRP, 317–18<br />

<strong>Fire</strong> prevention, 147–66<br />

arson and site security, 165–6<br />

precautions <strong>to</strong> be taken, 165<br />

secure fencing required, 165<br />

chemicals and LPG (hazardous<br />

materials), 150–6<br />

s<strong>to</strong>rage, external and internal,<br />

151–4<br />

substitution, 151<br />

training, 154<br />

ventilation of s<strong>to</strong>rage areas, 155<br />

ventilation/fume cupboards, 155–6<br />

construction and maintenance,<br />

159–61<br />

contrac<strong>to</strong>r management, 159<br />

initial selection stage, 159–60<br />

safety performance, 160<br />

tender stage selection, 160–1<br />

construction phase fi re safety check<br />

list, 170–1<br />

cookers, associated cooking<br />

equipment and installations,<br />

148–50<br />

planned preventive maintenance<br />

(PPM), 149<br />

use of CORGI installers for gas<br />

equipment, 149<br />

use of fi xed fi re fi ghting<br />

installations, 149<br />

demolition, 165<br />

combatting high risk of fi re and<br />

explosion, 165<br />

demolition surveys must be<br />

undertaken, 165<br />

electrical appliances and<br />

installations, 147–8<br />

PAT testing, 148<br />

electrical and gas supplies,<br />

installations and equipment,<br />

162–3<br />

electrical safety, 162, 163<br />

use of CORGI gas fi tters only,<br />

162–3<br />

heaters and heating systems, 150<br />

need for awareness training, 150<br />

hot work, 163–5<br />

hot work permits, 163–4, 167–8<br />

use of temporary fabrication (fab)<br />

shop, 163<br />

managing the contract, 161<br />

areas needing consideration, 161<br />

naked lights and fl ames, 150<br />

avoidance of, 150<br />

avoidance of rubbish burning, 150<br />

other signifi cant hazards, 157–8<br />

electro-mechanical equipment, 158<br />

electrostatic discharge, 157–8<br />

performance review, 162<br />

formal review, 162<br />

moni<strong>to</strong>ring contrac<strong>to</strong>r’s<br />

performance, 162<br />

safety conditions of the contract,<br />

161–2<br />

safety conditions/rules that might<br />

be imposed, 161–2<br />

safety conditions of the contract<br />

.effective communication<br />

channels, 162<br />

smokers and smokers’ materials,<br />

156–7<br />

provision of smokers’ booths, 156<br />

reducing risk in nursing homes,<br />

156–7<br />

vehicles, 158–9<br />

battery recharging, 158<br />

formal procedures for refuelling or<br />

recharging, 158<br />

refuelling LPG-powered vehicles,<br />

159<br />

rudimentary control of fl ammable<br />

vapours, 158<br />

Index<br />

waste and waste management<br />

systems, 157<br />

written policy for, 147<br />

‘<strong>Fire</strong> Prevention on Construction Sites’<br />

(code of practice), 24<br />

compliance with for insurance<br />

purposes, 24<br />

<strong>Fire</strong> protection (preventive and<br />

protective measures), 173<br />

active fi re protection, 173<br />

passive fi re protection, 173<br />

<strong>Fire</strong> and Rescue Service:<br />

capacity of remote and combined fi re<br />

fi ghting systems, 321<br />

discussion of fi re fi ghting strategy<br />

with, 321<br />

false alarms, diversion from fi re<br />

prevention duties, 294–5<br />

investigation of fi re-related events,<br />

293–5<br />

must report all fi res in buildings <strong>to</strong><br />

DCLG on form FDR1, 296, 297,<br />

307–10<br />

powers of, 298<br />

late calls, 298<br />

supplementary powers, 298<br />

<strong>Fire</strong> and Rescue Services Act (2004)<br />

see FRSA<br />

<strong>Fire</strong> resistance, defi ned, 172, 188<br />

<strong>Fire</strong> risk, 328<br />

<strong>Fire</strong> risk assessment, 45, 321, 328–44<br />

defi nitions relating <strong>to</strong>, 328–9<br />

and emergency evacuation<br />

procedures, 254<br />

introduction section, 330<br />

record and action plan, 340–4<br />

risk assessment process, 329–39<br />

HM Government guidance<br />

documents, 329<br />

in small offi ce facility, 95<br />

see also Risk assessment<br />

<strong>Fire</strong> risk assessment process,<br />

329–39<br />

the emergency plan, 338–9<br />

in multi-occupied and more<br />

complex premises, 338<br />

must be recorded, 338<br />

purpose of, 338<br />

practical steps, 329–30<br />

access <strong>to</strong> key personnel, 330<br />

documentation, 329–30<br />

documents, from Building<br />

Regulations and British<br />

Standards required, 330<br />

recording the assessment, 331–3<br />

additional control measures, 333<br />

closing the assessment out, 333<br />

evaluating existing control<br />

measures, 332–3<br />

groups/persons at risk, 332<br />

hazards, primary and secondary,<br />

331–2<br />

introduction, 331<br />

management arrangements, 331<br />

reviewing and revising the fi re risk<br />

assessment, 337–8<br />

409

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!