Hwy. 2 / Hayford Rd. S 2012 – Phase 1 2012 – Buildout +<br />

Craig Rd. / Deno Rd. U + + +<br />

Craig Rd. / McFarlane St. U + + +<br />

Craig Rd. / Thorpe Rd. East U + + +<br />

Craig Rd. / Thorpe Rd. West U + + +<br />

Craig Rd. / SR 902 U 2012 – Phase 1 2012 – Buildout 2012 – Buildout<br />

Hwy. 2 / Fairchild AFB S + + +<br />

Craig Rd. / 6 th Ave. U 2019 – Phase 3 + +<br />

Hwy 2 / Driveway West U + + +<br />

Hwy 2 / Driveway Middle U 2012 – Phase 1 2012 – Buildout 2012 – Buildout<br />

Hwy 2 / Driveway East U + + +<br />

Craig Rd. / Driveway North U + + +<br />

Craig Rd. / Driveway Middle U + + +<br />

Craig Rd. / Driveway South U + + +<br />

+ Acceptable LOS for alternative analyzed<br />

Mitigation improvements for congested intersections are discussed in the following Re<strong>com</strong>mendations<br />

section.<br />

Regarding bike and pedestrian facilities, there are limited facilities in the immediate vicinity of the<br />

project site. Pedestrian facilities are provided and bikes are ac<strong>com</strong>modated via the paved shoulder along<br />

Hwy 2 east of Craig Rd. Pedestrian and bike facilities are provided along much of the roadway network<br />

within the developed portions of Airway Heights to the east of the project site.<br />

Transit service is provided to Airway Heights by Spokane Transit Authority (STA) via Route 61. This<br />

route terminates within the City of Spokane at the downtown transit plaza and makes stops at the Airway<br />

Heights Park & Ride west of Hwy 2/Lawson and within Fairchild Air Force Base, seven days a week.<br />

During peak period busses operate with one-half hour headways and off peak periods have one-hour<br />

headways.<br />

Operational analysis results for the various scenarios analyzed are summarized in the tables at the end of<br />

the Executive Summary.<br />

Re<strong>com</strong>mendations<br />

Mitigation re<strong>com</strong>mendations are summarized below for each project alternative. At locations where<br />

traffic signalization is re<strong>com</strong>mended, a signal warrant analysis was performed to aid in determining if<br />

signalization was an appropriate improvement alternative to consider.<br />

The off-site improvements not contiguous with the project site should be constructed in a phased manner<br />

so that they are installed at the appropriate time and roughly corresponding to the phase of project<br />

development being undertaken.<br />

For off-site improvements that are not contiguous with the project site or related to site access, the<br />

Spokane Tribe should contribute its proportional share of the cost required to construct the identified<br />

improvements; the project proportional share was calculated by dividing the project generated traffic<br />

volume by the total intersection traffic volume.<br />

West Plains Development – Spokane Tribe Page | 4<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!