21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

7: McFarlane Rd. & Craig Road 2/14/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 0 0 0 52 0 34 0 236 43 45 303 0<br />

Sign Control Stop Stop Free Free<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92<br />

Hourly flow rate (vph) 0 0 0 57 0 37 0 257 47 49 329 0<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type None None<br />

Median storage veh)<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 744 730 329 707 707 280 329 303<br />

vC1, stage 1 conf vol<br />

vC2, stage 2 conf vol<br />

vCu, unblocked vol 744 730 329 707 707 280 329 303<br />

tC, single (s) 7.1 6.5 6.2 7.2 6.6 6.3 4.1 4.1<br />

tC, 2 stage (s)<br />

tF (s) 3.5 4.0 3.3 3.6 4.1 3.4 2.2 2.2<br />

p0 queue free % 100 100 100 83 100 95 100 96<br />

cM capacity (veh/h) 305 336 712 331 338 743 1213 1269<br />

Direction, Lane # EB 1 WB 1 NB 1 SB 1<br />

Volume Total 0 93 303 378<br />

Volume Left 0 57 0 49<br />

Volume Right 0 37 47 0<br />

cSH 1700 424 1213 1269<br />

Volume to Capacity 0.00 0.22 0.00 0.04<br />

Queue Length 95th (ft) 0 21 0 3<br />

Control Delay (s) 0.0 15.9 0.0 1.4<br />

Lane LOS A C A<br />

Approach Delay (s) 0.0 15.9 0.0 1.4<br />

Approach LOS A C<br />

Intersection Summary<br />

Average Delay 2.6<br />

Intersection Capacity Utilization 48.4% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> 5:00 pm 2/8/2011 2032 Alternative 3 Buildout<br />

Synchro 7 - Report<br />

Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!