21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

3: Hwy. 2 & Lawson St 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 76 2201 44 93 1699 52 90 44 94 89 39 57<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 0.97 1.00 0.97 1.00<br />

Satd. Flow (prot) 1787 3564 1787 3558 1820 1599 1818 1599<br />

Flt Permitted 0.95 1.00 0.95 1.00 0.55 1.00 0.53 1.00<br />

Satd. Flow (perm) 1787 3564 1787 3558 1040 1599 998 1599<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 82 2367 47 100 1827 56 97 47 101 96 42 61<br />

RTOR Reduction (vph) 0 1 0 0 1 0 0 0 42 0 0 26<br />

Lane Group Flow (vph) 82 2413 0 100 1882 0 0 144 59 0 138 35<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 4 4 8 8<br />

Actuated Green, G (s) 8.0 80.2 8.1 80.3 19.8 19.8 19.8 19.8<br />

Effective Green, g (s) 8.0 80.2 8.1 80.3 19.8 19.8 19.8 19.8<br />

Actuated g/C Ratio 0.07 0.66 0.07 0.66 0.16 0.16 0.16 0.16<br />

Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.8 3.0 2.5 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 117 2341 119 2340 169 259 162 259<br />

v/s Ratio Prot 0.05 c0.68 0.06 c0.53<br />

v/s Ratio Perm c0.14 0.04 0.14 0.02<br />

v/c Ratio 0.70 1.03 0.84 0.80 0.85 0.23 0.85 0.14<br />

Uniform Delay, d1 55.9 20.9 56.4 15.2 49.7 44.5 49.7 43.8<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 17.3 27.0 38.5 2.0 31.6 0.5 32.6 0.2<br />

Delay (s) 73.1 48.0 94.9 17.2 81.3 45.0 82.3 44.1<br />

Level of Service E D F B F D F D<br />

Approach Delay (s) 48.8 21.1 66.3 70.6<br />

Approach LOS D C E E<br />

Intersection Summary<br />

HCM Average Control Delay 39.4 HCM Level of Service D<br />

HCM Volume to Capacity ratio 0.96<br />

Actuated Cycle Length (s) 122.1 Sum of lost time (s) 9.0<br />

Intersection Capacity Utilization 93.0% ICU Level of Service F<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

c Critical Lane Group<br />

2019 plus Project, Alt. 1, PH3 Synchro 7 - Report<br />

cak Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!