21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

9: Thorpe & Craig 1/18/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (veh/h) 2 3 178 3 3 127<br />

Sign Control Free Free Stop<br />

Grade 0% 0% 0%<br />

Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83<br />

Hourly flow rate (vph) 2 4 214 4 4 153<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type None None<br />

Median storage veh)<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 6 437 4<br />

vC1, stage 1 conf vol<br />

vC2, stage 2 conf vol<br />

vCu, unblocked vol 6 437 4<br />

tC, single (s) 4.1 6.4 6.2<br />

tC, 2 stage (s)<br />

tF (s) 2.2 3.5 3.3<br />

p0 queue free % 87 99 86<br />

cM capacity (veh/h) 1628 499 1076<br />

Direction, Lane # EB 1 WB 1 NB 1<br />

Volume Total 6 218 157<br />

Volume Left 0 214 4<br />

Volume Right 4 0 153<br />

cSH 1700 1628 1048<br />

Volume to Capacity 0.00 0.13 0.15<br />

Queue Length 95th (ft) 0 11 13<br />

Control Delay (s) 0.0 7.4 9.0<br />

Lane LOS A A<br />

Approach Delay (s) 0.0 7.4 9.0<br />

Approach LOS<br />

A<br />

Intersection Summary<br />

Average Delay 8.0<br />

Intersection Capacity Utilization 31.4% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

2019 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!