21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

4: Hwy. 2 & Garfield St. 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 125 2057 23 38 2134 219 52 24 97 177 19 100<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 0.85 0.92 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 0.96 1.00<br />

Satd. Flow (prot) 1787 3568 1787 3574 1599 1697 1818 1615<br />

Flt Permitted 0.95 1.00 0.95 1.00 1.00 0.69 0.53 1.00<br />

Satd. Flow (perm) 1787 3568 1787 3574 1599 1195 1009 1615<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 134 2212 25 41 2295 235 56 26 104 190 20 108<br />

RTOR Reduction (vph) 0 0 0 0 0 56 0 37 0 0 0 58<br />

Lane Group Flow (vph) 134 2237 0 41 2295 179 0 149 0 0 210 50<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 2% 2% 2% 0% 0% 0%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 2 4 8 8<br />

Actuated Green, G (s) 9.5 77.1 3.9 71.5 71.5 28.7 28.7 28.7<br />

Effective Green, g (s) 9.5 77.1 3.9 71.5 71.5 28.7 28.7 28.7<br />

Actuated g/C Ratio 0.08 0.61 0.03 0.57 0.57 0.23 0.23 0.23<br />

Clearance Time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.1 3.1 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 135 2188 55 2033 910 273 230 369<br />

v/s Ratio Prot c0.07 c0.63 0.02 c0.64<br />

v/s Ratio Perm 0.11 0.12 c0.21 0.03<br />

v/c Ratio 0.99 1.02 0.75 1.13 0.20 0.55 0.91 0.14<br />

Uniform Delay, d1 58.1 24.3 60.4 27.1 13.2 42.8 47.3 38.6<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 74.9 25.1 41.8 64.9 0.1 2.2 36.4 0.2<br />

Delay (s) 133.0 49.4 102.2 92.0 13.3 45.0 83.7 38.8<br />

Level of Service F D F F B D F D<br />

Approach Delay (s) 54.1 85.0 45.0 68.5<br />

Approach LOS D F D E<br />

Intersection Summary<br />

HCM Average Control Delay 69.2 HCM Level of Service E<br />

HCM Volume to Capacity ratio 1.12<br />

Actuated Cycle Length (s) 125.7 Sum of lost time (s) 21.5<br />

Intersection Capacity Utilization 104.3% ICU Level of Service G<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

c Critical Lane Group<br />

2019 plus Project, Alt. 1, PH3 Synchro 7 - Report<br />

cak Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!