21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

4: Hwy. 2 & Garfield St. 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 109 1246 7 38 1241 187 37 16 97 143 12 85<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 0.85 0.91 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 0.96 1.00<br />

Satd. Flow (prot) 1787 3571 1787 3574 1599 1679 1816 1615<br />

Flt Permitted 0.95 1.00 0.95 1.00 1.00 0.88 0.55 1.00<br />

Satd. Flow (perm) 1787 3571 1787 3574 1599 1504 1047 1615<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 117 1340 8 41 1334 201 40 17 104 154 13 91<br />

RTOR Reduction (vph) 0 0 0 0 0 83 0 54 0 0 0 72<br />

Lane Group Flow (vph) 117 1348 0 41 1334 118 0 107 0 0 167 19<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 2% 2% 2% 0% 0% 0%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 2 4 8 8<br />

Actuated Green, G (s) 12.7 62.5 5.0 54.8 54.8 22.1 22.1 22.1<br />

Effective Green, g (s) 12.7 62.5 5.0 54.8 54.8 22.1 22.1 22.1<br />

Actuated g/C Ratio 0.12 0.59 0.05 0.52 0.52 0.21 0.21 0.21<br />

Clearance Time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.1 3.1 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 215 2114 85 1855 830 315 219 338<br />

v/s Ratio Prot c0.07 c0.38 0.02 c0.37<br />

v/s Ratio Perm 0.07 0.07 c0.16 0.01<br />

v/c Ratio 0.54 0.64 0.48 0.72 0.14 0.34 0.76 0.06<br />

Uniform Delay, d1 43.7 14.1 49.0 19.5 13.2 35.5 39.3 33.4<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 2.8 0.6 4.3 1.4 0.1 0.6 14.5 0.1<br />

Delay (s) 46.5 14.8 53.3 20.9 13.3 36.2 53.8 33.5<br />

Level of Service D B D C B D D C<br />

Approach Delay (s) 17.3 20.7 36.2 46.6<br />

Approach LOS B C D D<br />

Intersection Summary<br />

HCM Average Control Delay 21.9 HCM Level of Service C<br />

HCM Volume to Capacity ratio 0.76<br />

Actuated Cycle Length (s) 105.6 Sum of lost time (s) 21.5<br />

Intersection Capacity Utilization 69.2% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

2015 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!