21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

5: Hwy. 2 & Hayford Rd. 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 406 1030 64 137 1021 194 65 191 173 344 128 283<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5<br />

Lane Util. Factor 0.97 0.95 1.00 0.95 1.00 1.00 0.95 0.97 0.95<br />

Frt 1.00 0.99 1.00 1.00 0.85 1.00 0.93 1.00 0.90<br />

Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3467 3543 1787 3574 1599 1805 3353 3467 3205<br />

Flt Permitted 0.95 1.00 0.95 1.00 1.00 0.50 1.00 0.19 1.00<br />

Satd. Flow (perm) 3467 3543 1787 3574 1599 947 3353 700 3205<br />

Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94<br />

Adj. Flow (vph) 432 1096 68 146 1086 206 69 203 184 366 136 301<br />

RTOR Reduction (vph) 0 2 0 0 0 123 0 102 0 0 223 0<br />

Lane Group Flow (vph) 432 1162 0 146 1086 83 69 285 0 366 214 0<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 0% 0% 0% 1% 1% 1%<br />

Turn Type Prot Prot Perm pm+pt pm+pt<br />

Protected Phases 5 2 1 6 3 8 7 4<br />

Permitted Phases 6 8 4<br />

Actuated Green, G (s) 22.4 54.0 16.6 48.2 48.2 26.0 17.0 41.6 27.1<br />

Effective Green, g (s) 22.4 54.0 16.6 48.2 48.2 26.0 17.0 41.6 27.1<br />

Actuated g/C Ratio 0.17 0.42 0.13 0.37 0.37 0.20 0.13 0.32 0.21<br />

Clearance Time (s) 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5<br />

Vehicle Extension (s) 3.0 2.5 3.0 2.1 2.1 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 603 1487 230 1339 599 251 443 637 675<br />

v/s Ratio Prot c0.12 c0.33 0.08 0.30 0.02 0.09 c0.09 0.07<br />

v/s Ratio Perm 0.05 0.04 c0.10<br />

v/c Ratio 0.72 0.78 0.63 0.81 0.14 0.27 0.64 0.57 0.32<br />

Uniform Delay, d1 50.2 32.2 53.2 36.2 26.6 42.6 53.0 33.9 43.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 4.0 2.6 5.6 3.7 0.0 0.6 3.2 1.3 0.3<br />

Delay (s) 54.2 34.9 58.8 39.8 26.6 43.2 56.2 35.2 43.2<br />

Level of Service D C E D C D E D D<br />

Approach Delay (s) 40.1 39.9 54.2 39.6<br />

Approach LOS D D D D<br />

Intersection Summary<br />

HCM Average Control Delay 41.4 HCM Level of Service D<br />

HCM Volume to Capacity ratio 0.70<br />

Actuated Cycle Length (s) 128.7 Sum of lost time (s) 16.5<br />

Intersection Capacity Utilization 78.8% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Add SB Left Turn Lane, Optimized<br />

c Critical Lane Group<br />

2012 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!