21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 2/9/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 451 49 314 547 361 744<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 1.00 1.00 1.00<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 1881 1805 1615<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 1881 1805 1615<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 626 68 436 760 501 1033<br />

RTOR Reduction (vph) 0 51 0 0 0 0<br />

Lane Group Flow (vph) 626 17 436 760 501 1033<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 16.7 16.7 11.5 34.2 23.7 67.9<br />

Effective Green, g (s) 16.7 16.7 11.5 34.2 23.7 67.9<br />

Actuated g/C Ratio 0.25 0.25 0.17 0.50 0.35 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 854 382 587 947 630 1615<br />

v/s Ratio Prot 0.18 0.13 c0.40 c0.28<br />

v/s Ratio Perm 0.01 0.64<br />

v/c Ratio 0.73 0.04 0.74 0.80 0.80 0.64<br />

Uniform Delay, d1 23.5 19.5 26.8 14.0 19.9 0.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 3.3 0.0 5.1 5.0 6.9 2.0<br />

Delay (s) 26.8 19.6 31.9 19.0 26.8 2.0<br />

Level of Service C B C B C A<br />

Approach Delay (s) 26.1 23.7 10.1<br />

Approach LOS C C B<br />

Intersection Summary<br />

HCM Average Control Delay 18.1 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.80<br />

Actuated Cycle Length (s) 67.9 Sum of lost time (s) 10.0<br />

Intersection Capacity Utilization 57.1% ICU Level of Service B<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

2012 plus Project, Alt. 3, Buildout Synchro 7 - Report<br />

cak Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!