21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

4: Hwy. 2 & Garfield St. 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 51 1153 7 37 1093 138 37 9 95 113 8 53<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 0.85 0.91 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 1.00 0.99 0.96 1.00<br />

Satd. Flow (prot) 1787 3571 1787 3574 1599 1672 1815 1615<br />

Flt Permitted 0.95 1.00 0.95 1.00 1.00 0.89 0.60 1.00<br />

Satd. Flow (perm) 1787 3571 1787 3574 1599 1505 1132 1615<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 55 1240 8 40 1175 148 40 10 102 122 9 57<br />

RTOR Reduction (vph) 0 0 0 0 0 69 0 60 0 0 0 45<br />

Lane Group Flow (vph) 55 1248 0 40 1175 79 0 92 0 0 131 12<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 2% 2% 2% 0% 0% 0%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 2 4 8 8<br />

Actuated Green, G (s) 6.8 46.7 4.5 44.4 44.4 17.9 17.9 17.9<br />

Effective Green, g (s) 6.8 46.7 4.5 44.4 44.4 17.9 17.9 17.9<br />

Actuated g/C Ratio 0.08 0.55 0.05 0.52 0.52 0.21 0.21 0.21<br />

Clearance Time (s) 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.1 3.1 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 143 1960 94 1865 834 317 238 340<br />

v/s Ratio Prot c0.03 c0.35 0.02 0.33<br />

v/s Ratio Perm 0.05 0.06 c0.12 0.01<br />

v/c Ratio 0.38 0.64 0.43 0.63 0.09 0.29 0.55 0.04<br />

Uniform Delay, d1 37.2 13.3 39.0 14.5 10.2 28.3 30.0 26.7<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 1.7 0.7 3.1 0.7 0.1 0.5 2.7 0.0<br />

Delay (s) 38.9 14.0 42.1 15.2 10.3 28.8 32.7 26.8<br />

Level of Service D B D B B C C C<br />

Approach Delay (s) 15.1 15.5 28.8 30.9<br />

Approach LOS B B C C<br />

Intersection Summary<br />

HCM Average Control Delay 16.9 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.57<br />

Actuated Cycle Length (s) 85.1 Sum of lost time (s) 10.5<br />

Intersection Capacity Utilization 64.6% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

2012 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!