21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. 902 (YEAR 2032 PM PEAK, Alt 1 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 1782 veh/h 2149 pers/h<br />

Percent Heavy Vehicles 1.1 %<br />

Degree of Saturation 0.912<br />

Practical Spare Capacity -6.9 %<br />

Effective Intersection Capacity<br />

1951 veh/h<br />

Control Delay (Total) 7.95 veh-h/h 9.54 pers-h/h<br />

Control Delay (Average) 16.1 sec 16.0 sec<br />

Control Delay (Worst Lane)<br />

25.0 sec<br />

Control Delay (Worst Movement) 29.1 sec 29.1 sec<br />

Geometric Delay (Average)<br />

5.0 sec<br />

Stop-Line Delay (Average)<br />

11.1 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS B<br />

Level of Service (Worst Movement)<br />

LOS C<br />

Level of Service (Worst Lane)<br />

LOS C<br />

95% Back of Queue - Vehicles (Worst Lane) 19.7 veh<br />

95% Back of Queue - Distance (Worst Lane) 495.8 ft<br />

Total Effective Stops 1880 veh/h 2255 pers/h<br />

Effective Stop Rate 1.05 per veh 1.05 per pers<br />

Proportion Queued 0.87 0.86<br />

Performance Index 49.5 49.5<br />

Travel Distance (Total) 654.6 veh-mi/h 785.5 pers-mi/h<br />

Travel Distance (Average) 1939 ft 1930 ft<br />

Travel Time (Total) 26.3 veh-h/h 31.5 pers-h/h<br />

Travel Time (Average) 53.1 sec 52.8 sec<br />

Travel Speed 24.9 mph 24.9 mph<br />

Cost (Total) 424.09 $/h 424.09 $/h<br />

Fuel Consumption (Total)<br />

32.2 gal/h<br />

Carbon Dioxide (Total)<br />

304.8 kg/h<br />

Hydrocarbons (Total)<br />

0.516 kg/h<br />

Carbon Monoxide (Total)<br />

23.07 kg/h<br />

NOx (Total)<br />

0.698 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 855,467 veh/y 1,031,360 pers/y<br />

Delay 3,815 veh-h/y 4,578 pers-h/y<br />

Effective Stops 902,181 veh/y 1,082,617 pers/y<br />

Travel Distance 314,209 veh-mi/y 377,051 pers-mi/y<br />

Travel Time 12,611 veh-h/y 15,134 pers-h/y<br />

Cost 203,565 $/y 203,565 $/y<br />

Fuel Consumption<br />

15,455 gal/y<br />

Carbon Dioxide<br />

146,320 kg/y<br />

Hydrocarbons<br />

248 kg/y<br />

Carbon Monoxide<br />

11,076 kg/y<br />

NOx<br />

335 kg/y<br />

Processed: Thursday, February 10, 2011 11:33:01 AM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\SR902-Craig Rd\2032 Alt1-Buildout-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!