21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MOVEMENT SUMMARY<br />

Middle Dwy./Hwy. (YEAR 2032 PM PEAK, Alt 1 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Movement Performance - Vehicles<br />

Mov ID Turn<br />

Demand<br />

Deg. Average Level of 95% Back of Queue Prop. Effective Average<br />

Flow HV Satn Delay Service VehiclesDistance Queued Stop Rate Speed<br />

veh/h % v/c sec veh ft per veh mph<br />

East: Hwy. 2<br />

6T T 2287 1.0 1.062 64.5 LOS E 52.0 1310.2 1.00 1.91 12.0<br />

6R R 398 1.0 0.248 0.0 X X X X 0.33 32.1<br />

Approach 2685 1.0 1.062 54.9 LOS D 52.0 1310.2 0.85 1.68 13.3<br />

North: Middle Dwy.<br />

7L L 407 1.0 0.838 65.5 LOS E 7.1 178.0 0.99 1.24 12.5<br />

4R R 243 1.0 0.152 0.0 X X X X 0.33 32.1<br />

Approach 651 1.0 0.838 41.0 LOS D 7.1 178.0 0.62 0.90 15.9<br />

West: Hwy. 2<br />

5L L 324 1.0 0.462 11.8 LOS B 2.5 63.0 0.62 0.86 23.0<br />

2T T 2087 1.0 0.991 45.4 LOS D 25.8 650.9 1.00 1.43 15.4<br />

Approach 2412 1.0 0.991 40.9 LOS D 25.8 650.9 0.95 1.36 16.2<br />

All Vehicles5747 1.0 1.062 47.5 LOS D 52.0 1310.2 0.87 1.46 14.7<br />

X: Not applicable for Continuous movement.<br />

Level of Service (LOS) Method: Delay (HCM 2000).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Vehicle movement LOS values are based on average delay per movement<br />

Intersection and Approach LOS values are based on average delay for all vehicle movements.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

HCM Delay Model used.<br />

Processed: Wednesday, July 13, 2011 10:41:23 AM Copyright © 2000-2011 Akcelik and Associates Pty Ltd<br />

SIDRA INTERSECTION 5.1.3.1990<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\April 2011-Final TIA\Sidra\7-12-11\Hwy.2-Middle Dwy\2032 Alt1-<br />

Buildout-Middle.sip<br />

8000011, DAVID EVANS & ASSOCIATES INC, SINGLE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!